Developing work breakdown structure matrix for managing offsite construction projects

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Work breakdown structure (WBS) development for underground construction

a r t i c l e i n f o A work breakdown structure (WBS) can prove to be pivotal to successful project management planning. There are few published studies about the methodologies or tools to develop the appropriate WBS for a project, and those that are available are limited to the specific areas of construction such as apartment-building construction and boiler manufacturing. This research has a...

متن کامل

Integrating Process and Work Breakdown Structure with Design Structure Matrix

∗Department of Computer Science and Information Engineering, National Central University, Jhongli, Taiwan E-mail: {yjlee, jass, wtlee, jielee}@selab.csie.ncu.edu.tw ∗∗Department of Computer and Information Science, National Taichung University, Taichung, Taiwan E-mail: [email protected] ∗∗∗Department of Computer Science and Engineering, National Taiwan Ocean University, Keelung, Taiwan E-m...

متن کامل

Developing a recommender system for assigning projects to supervising engineers (Case study: Damghan construction engineering organization)

Supervising engineers are one of the most important actors in construction industry and have an important role in improving quality and increasing safety. However, assigning projects to these engineers in some cases are unjust and inefficient. Therefore, in this paper a recommender system is developed in which the competencies of engineers along with the features of the projects are considered....

متن کامل

A Work Breakdown Structure that Integrates Different Views in Aircraft Modification Projects

The Work Breakdown Structure (WBS) defines the work scope of a project. The way a WBS is defined depends on the person and his/her viewpoint. The aircraft modification business carries out a great variety of projects. Although the core skills and tasks are similar, there are very few projects that are exact repetition of previous work. The reuse of information is difficult without a good struct...

متن کامل

Managing concerns in rapid renewal highway construction projects

H CONSTRUCTION WORK can be demanding and exhausting. It requires intense focus and physical exertion, the use of heavy mobile equipment and repetitive work tasks, and it is performed adjacent to traffic (NIOSH, 2001). These factors all contribute to the relatively high injury rate in the construction sector (BLS, 2007). Traditionally, roadway construction has been performed during normal, dayti...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Architectural Engineering and Design Management

سال: 2018

ISSN: 1745-2007,1752-7589

DOI: 10.1080/17452007.2018.1477728