Development of Production Scheduling System for Flexible Transfer Line
نویسندگان
چکیده
منابع مشابه
Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line
This paper breaks new ground by modelling lot sizing and scheduling in a flexible flow line (FFL) simultaneously instead of separately. This problem, called the ‘General Lot sizing and Scheduling Problem in a Flexible Flow Line’ (GLSP-FFL), optimizes the lot sizing and scheduling of multiple products at multiple stages, each stage having multiple machines in parallel. The objective is to satisf...
متن کاملfaciliting lexical access for the fluent production of speech
the hypothesis is that recent and frequent exposure to lexical items leads to a more fluent production of speech in terms of rate of speech. to test the hypothesis,a one-way anova experimental design was carried out. 24 sednior students of efl participated in a one-way interview test. data analyses revealed that those who were exposed frequently to the lexical items over a week prior to inter...
15 صفحه اولfacilitating lexical access for the fluent production of speech
the hypothesis is that recent and frequent exposure to lexical items leads to a more fluent production of speech in terms of rate of speech. to test the hypothesis , a one- way anova experimental design was carried out. 24 senior student of efl participated in a one-way interview test. data analyses revealed that those who were exposed frequently to the lexical items over a week prior to inte...
15 صفحه اولNew scheduling rules for a dynamic flexible flow line problem with sequence-dependent setup times
In the literature, the application of multi-objective dynamic scheduling problem and simple priority rules are widely studied. Although these rules are not efficient enough due to simplicity and lack of general insight, composite dispatching rules have a very suitable performance because they result from experiments. In this paper, a dynamic flexible flow line problem with sequence-dependent se...
متن کاملMathematical Modeling for a Flexible Manufacturing Scheduling Problem in an Intelligent Transportation System
This paper presents a new mathematical model for a production system through a scheduling problem considering a material handling system as an intelligent transportation system by automated guided vehicles (AGVs). The traditional systems cannot respond to the changes and customer’s demands and for this reason, a flexible production system is used. Therefore, for this purpose, automated transpor...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Transactions of the Institute of Systems, Control and Information Engineers
سال: 1997
ISSN: 1342-5668,2185-811X
DOI: 10.5687/iscie.10.137