Development of Risk-Based Standardized WBS (Work Breakdown Structure) for Safety Planning of Coal Mine Project with Surface Mining Methode

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Work breakdown structure (WBS) development for underground construction

a r t i c l e i n f o A work breakdown structure (WBS) can prove to be pivotal to successful project management planning. There are few published studies about the methodologies or tools to develop the appropriate WBS for a project, and those that are available are limited to the specific areas of construction such as apartment-building construction and boiler manufacturing. This research has a...

متن کامل

Project Management System Based on Work-Breakdown-Structure Process Model

We have developed a “WBS(Work Breakdown Structure) process model” for a business application software development project. We have also developed a project management system called “PRO-NAVI” which works on the “WBS process model.” This WBS process model” provides (1) mutual mapping between the “software development processes”, “activities”, “products”, “know-how,” “rules”, and “standards”, and...

متن کامل

development of a universal safety behavior management system for coal mine workers

background : in china, over 80% of all work-related deaths in the mining industry occur in coal mines and human factors constitute 85% of the direct causes of coal mine accidents, which indicates that significant shortcomings cur-rently exist in the safety behavior management of chinese coal mine workers. we aimed to verify the impact of human psychological behavior in coal mine accidents syste...

متن کامل

Work Breakdown Structure: A Tool for Software Project Scope Verification

Software project scope verification is a very important process in project scope management and it needs to be performed properly and thoroughly so as to avoid project rework and scope creep. Moreover, software scope verification is crucial in the process of delivering exactly what the customer requested and minimizing project scope changes. Well defined software scope eases the process of scop...

متن کامل

application of upfc based on svpwm for power quality improvement

در سالهای اخیر،اختلالات کیفیت توان مهمترین موضوع می باشد که محققان زیادی را برای پیدا کردن راه حلی برای حل آن علاقه مند ساخته است.امروزه کیفیت توان در سیستم قدرت برای مراکز صنعتی،تجاری وکاربردهای بیمارستانی مسئله مهمی می باشد.مشکل ولتاژمثل شرایط افت ولتاژواضافه جریان ناشی از اتصال کوتاه مدار یا وقوع خطا در سیستم بیشتر مورد توجه می باشد. برای مطالعه افت ولتاژ واضافه جریان،محققان زیادی کار کرده ...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IOP Conference Series: Materials Science and Engineering

سال: 2020

ISSN: 1757-899X

DOI: 10.1088/1757-899x/1007/1/012005