Development of the generalized configuration management process effectiveness assessing model in project management
نویسندگان
چکیده
منابع مشابه
Assessing the effectiveness of knowledge management using Analytic Network Process
Knowledge management in higher education is a set of organizational processes that support creating and transferring the knowledge in these institutions and allows for achieving organizational and university objectives. Therefore, for the proper management of organizational knowledge, appropriate tools are needed to be able to be aware of the effectiveness of knowledge management in organizatio...
متن کاملAssessing Project Management Maturity Comparing Process Definition and Process Practice
In this paper we present a case study on assessing project management maturity in organizations. The purpose is to develop an understanding of what project maturity is and to investigate process definition and practice maturity level in nine knowledge areas based on PMBOK standard and suggesting initiatives to improve maturity level. Maturity itself is measured along two dimensions. They are Pr...
متن کاملConfiguration Management Process Capabilities
The literature suggests that maturity assessment tools could be successful if based on process capabilities which are the outcomes of critical success factors and barriers to a process. This paper investigate the configuration management process capabilities finalized on the basis of semi-structured interviews with configuration management professionals and analysis of two highly significant st...
متن کاملConfiguration Management of the Model-Based Design Process
Today, many leading automotive OEMs and Suppliers are adopting Model-Based Design for the development of embedded systems applications. In this paper, the authors review the challenges of performing configuration management that is adequate for use in a production environment of the models and associated files central to Model-Based Design.
متن کاملProject Management Process Maturity „PM...2 Model
This paper presents the project management process maturity (PM) model that determines and positions an organization’s relative project management level with other organizations. The comprehensive model follows a systematic approach to establish an organization’s current project management level. Each maturity level consists of major project management characteristics, factors, and processes. T...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Technology audit and production reserves
سال: 2015
ISSN: 2312-8372,2226-3780
DOI: 10.15587/2312-8372.2015.47969