Development of work breakdown structure (WBS) dictionary for road construction works

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Work breakdown structure (WBS) development for underground construction

a r t i c l e i n f o A work breakdown structure (WBS) can prove to be pivotal to successful project management planning. There are few published studies about the methodologies or tools to develop the appropriate WBS for a project, and those that are available are limited to the specific areas of construction such as apartment-building construction and boiler manufacturing. This research has a...

متن کامل

Work Breakdown Structure: A Tool for Software Project Scope Verification

Software project scope verification is a very important process in project scope management and it needs to be performed properly and thoroughly so as to avoid project rework and scope creep. Moreover, software scope verification is crucial in the process of delivering exactly what the customer requested and minimizing project scope changes. Well defined software scope eases the process of scop...

متن کامل

Integrating Process and Work Breakdown Structure with Design Structure Matrix

∗Department of Computer Science and Information Engineering, National Central University, Jhongli, Taiwan E-mail: {yjlee, jass, wtlee, jielee}@selab.csie.ncu.edu.tw ∗∗Department of Computer and Information Science, National Taichung University, Taichung, Taiwan E-mail: [email protected] ∗∗∗Department of Computer Science and Engineering, National Taiwan Ocean University, Keelung, Taiwan E-m...

متن کامل

Construction of Domain Dictionary for Fundamental Vocabulary

For natural language understanding, it is essential to reveal semantic relations between words. To date, only the IS-A relation has been publicly available. Toward deeper natural language understanding, we semiautomatically constructed the domain dictionary that represents the domain relation between Japanese fundamental words. This is the first Japanese domain resource that is fully available....

متن کامل

The work breakdown structure in software project management

The work breakdown structure (WBS) is a vehicle for breaking an engineering project down into subproject, tasks, subtasks, work packages, and so on. It is an important planning tool which links objectives with resources and activities in a logical framework. It becomes an important status monitor during the actual implementation as the completions of subtasks are measured against the project pl...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IOP Conference Series: Earth and Environmental Science

سال: 2018

ISSN: 1755-1315

DOI: 10.1088/1755-1315/195/1/012007