Development of Work Breakdown Structure (WBS) for Safety Planning on Tunneling Work Projects Based on Risk

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Work breakdown structure (WBS) development for underground construction

a r t i c l e i n f o A work breakdown structure (WBS) can prove to be pivotal to successful project management planning. There are few published studies about the methodologies or tools to develop the appropriate WBS for a project, and those that are available are limited to the specific areas of construction such as apartment-building construction and boiler manufacturing. This research has a...

متن کامل

application of upfc based on svpwm for power quality improvement

در سالهای اخیر،اختلالات کیفیت توان مهمترین موضوع می باشد که محققان زیادی را برای پیدا کردن راه حلی برای حل آن علاقه مند ساخته است.امروزه کیفیت توان در سیستم قدرت برای مراکز صنعتی،تجاری وکاربردهای بیمارستانی مسئله مهمی می باشد.مشکل ولتاژمثل شرایط افت ولتاژواضافه جریان ناشی از اتصال کوتاه مدار یا وقوع خطا در سیستم بیشتر مورد توجه می باشد. برای مطالعه افت ولتاژ واضافه جریان،محققان زیادی کار کرده ...

15 صفحه اول

Project Management System Based on Work-Breakdown-Structure Process Model

We have developed a “WBS(Work Breakdown Structure) process model” for a business application software development project. We have also developed a project management system called “PRO-NAVI” which works on the “WBS process model.” This WBS process model” provides (1) mutual mapping between the “software development processes”, “activities”, “products”, “know-how,” “rules”, and “standards”, and...

متن کامل

A Model-Based Approach for Planning Work Breakdown Structures of Complex Systems Projects

Planning the development efforts within large-scale projects is a highly complicated mission due to uncertainties regarding different aspects of the complex product to be delivered. Current planning practices employ a host of methods, including Work Breakdown Structure (WBS). Using WBS, the deliverable—the end product to be delivered, its components, and associated enabling products—are mostly ...

متن کامل

in translation: translators on their work and what it means

کتاب در باب ترجمه، اثر استر آلن و سوزان برنوفسکی منتشر شده در ماه می 2013 توسط نشریه کلمبیا است. نویسندگان در این کتاب به بررسی 18 مترجم با در نظر گرفتن نقش آثاری که این مترجمان ترجمه کرده اند میپردازند. کتاب به دو بخش تقسیم میشود: " مترجم در جهان" و " کار مترجم" این دو بخش مقالات همیشگی ترجمه و موقعیت خاص ادبیات بیگانه در جهان وسیع امروزی را مورد خطاب قرار میدهد. در این کتاب مقالات متعددی از ن...

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Physics: Conference Series

سال: 2021

ISSN: 1742-6588,1742-6596

DOI: 10.1088/1742-6596/1858/1/012076