Directed Acyclic Task Graph Scheduling for Heterogeneous Computing Systems by Dynamic Critical Path Duplication Algorithm
                    
                        
                            نویسندگان
                            
                            
                        
                        
                    
                    
                    چکیده
منابع مشابه
An Efficient Genetic Algorithm for Task Scheduling on Heterogeneous Computing Systems Based on TRIZ
An efficient assignment and scheduling of tasks is one of the key elements in effective utilization of heterogeneous multiprocessor systems. The task scheduling problem has been proven to be NP-hard is the reason why we used meta-heuristic methods for finding a suboptimal schedule. In this paper we proposed a new approach using TRIZ (specially 40 inventive principles). The basic idea of thi...
متن کاملAn Efficient Genetic Algorithm for Task Scheduling on Heterogeneous Computing Systems Based on TRIZ
An efficient assignment and scheduling of tasks is one of the key elements in effective utilization of heterogeneous multiprocessor systems. The task scheduling problem has been proven to be NP-hard is the reason why we used meta-heuristic methods for finding a suboptimal schedule. In this paper we proposed a new approach using TRIZ (specially 40 inventive principles). The basic idea of thi...
متن کاملA Task Duplication Based Scheduling Algorithm for Heterogeneous Systems
Optimal scheduling of tasks of a directed acyclic graph (DAG) onto a set of processors is a strong NP-hard problem. In this paper we present a scheduling scheme called TDS to schedule tasks of a DAG onto a heterogeneous system. This models a network of workstations, with processors of varying computing power. The primary objective of this scheme is to minimize schedule length and scheduling tim...
متن کاملTask Scheduling Algorithm for High Performance Heterogeneous Distributed Computing Systems
The main objective of task scheduling is to assign tasks onto available processors with the aim of producing minimum schedule length and without violating the precedence constraints. Several algorithms have been proposed for solving task-scheduling problem. The most of them doesn't take into account the average communication of parents and data ready time. In this paper, a new static scheduling...
متن کاملOptimization Task Scheduling Algorithm in Cloud Computing
Since software systems play an important role in applications more than ever, the security has become one of the most important indicators of softwares.Cloud computing refers to services that run in a distributed network and are accessible through common internet protocols. Presenting a proper scheduling method can lead to efficiency of resources by decreasing response time and costs. This rese...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Algorithms & Computational Technology
سال: 2009
ISSN: 1748-3026,1748-3026
DOI: 10.1260/174830109787914001