Directed Acyclic Task Graph Scheduling for Heterogeneous Computing Systems by Dynamic Critical Path Duplication Algorithm

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Efficient Genetic Algorithm for Task Scheduling on Heterogeneous Computing Systems Based on TRIZ

An efficient assignment and scheduling of tasks is one of the key elements in effective utilization of heterogeneous multiprocessor systems. The task scheduling problem has been proven to be NP-hard is the reason why we used meta-heuristic methods for finding a suboptimal schedule. In this paper we proposed a new approach using TRIZ (specially 40 inventive principles). The basic idea of thi...

متن کامل

An Efficient Genetic Algorithm for Task Scheduling on Heterogeneous Computing Systems Based on TRIZ

An efficient assignment and scheduling of tasks is one of the key elements in effective utilization of heterogeneous multiprocessor systems. The task scheduling problem has been proven to be NP-hard is the reason why we used meta-heuristic methods for finding a suboptimal schedule. In this paper we proposed a new approach using TRIZ (specially 40 inventive principles). The basic idea of thi...

متن کامل

A Task Duplication Based Scheduling Algorithm for Heterogeneous Systems

Optimal scheduling of tasks of a directed acyclic graph (DAG) onto a set of processors is a strong NP-hard problem. In this paper we present a scheduling scheme called TDS to schedule tasks of a DAG onto a heterogeneous system. This models a network of workstations, with processors of varying computing power. The primary objective of this scheme is to minimize schedule length and scheduling tim...

متن کامل

Task Scheduling Algorithm for High Performance Heterogeneous Distributed Computing Systems

The main objective of task scheduling is to assign tasks onto available processors with the aim of producing minimum schedule length and without violating the precedence constraints. Several algorithms have been proposed for solving task-scheduling problem. The most of them doesn't take into account the average communication of parents and data ready time. In this paper, a new static scheduling...

متن کامل

Optimization Task Scheduling Algorithm in Cloud Computing

Since software systems play an important role in applications more than ever, the security has become one of the most important indicators of softwares.Cloud computing refers to services that run in a distributed network and are accessible through common internet protocols. Presenting a proper scheduling method can lead to efficiency of resources by decreasing response time and costs. This rese...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Algorithms & Computational Technology

سال: 2009

ISSN: 1748-3026,1748-3026

DOI: 10.1260/174830109787914001