Dominance-based linear formulation for the Anchor-Robust Project Scheduling Problem

نویسندگان

چکیده

In project scheduling under processing times uncertainty, the Anchor-Robust Project Scheduling Problem is to find a baseline schedule of bounded makespan and max-weight subset jobs whose starting are guaranteed. The problem was proven NP-hard even for budgeted uncertainty. present work we design mixed-integer programming (MIP) formulations that valid variety uncertainty sets encompassing A new dominance among solutions proposed, resulting into an MIP formulation. We further study combinatorial structure problem. Non-trivial polynomial cases exhibited, where dominance-based formulation yields polyhedral characterization integer solutions. more general cases, shown be tighter than all previously known formulations. numerical experiments investigate how performs on instances around both elaborate involving several budgets.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Exact Algorithm for the Mode Identity Project Scheduling Problem

In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. We present a depth-first branch and bound algorithm for the resource constrained project schedulin...

متن کامل

Developing Robust Project Scheduling Methods for Uncertain Parameters

A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...

متن کامل

A Novel Multiobjective Formulation of the Robust Software Project Scheduling Problem

The Software Project Scheduling (SPS) problem refers to the distribution of tasks during a software project lifetime. Software development involves managing human resources and a total budget in an optimal way for a successful project which, in turn, demonstrates the importance of the SPS problem for software companies. This paper proposes a novel formulation for the SPS problem which takes int...

متن کامل

Robust Solutions for the Resource-Constrained Project Scheduling Problem

Robustness is essential for schedules if they are being executed under uncertain conditions. In this thesis we research robustness in Partial Order Schedules, which represent sets of solutions for instances of the Resource-Constrained Project Scheduling Problem. They can be generated using a greedy procedure called Chaining, which can be easily adapted to use various heuristics. We use an empir...

متن کامل

A stochastic model for project selection and scheduling problem

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: European Journal of Operational Research

سال: 2021

ISSN: ['1872-6860', '0377-2217']

DOI: https://doi.org/10.1016/j.ejor.2021.02.034