DRILL BIT MONITORING AND REPLACEMENT OPTIMIZATION IN OPEN-PIT MINES

نویسندگان

چکیده

Since 2012, low commodity prices have forced many mining companies to suspend or cease operations. To remain in business, some mine managers are exploring strategies reduce operational costs. Given its importance as a cost element, increasing bench drilling efficiency and performance open-pit mines has the potential generate considerable savings. Efficiency gains can be realized by monitoring operation, analyzing data with statistical tools optimizing variables. Finding best configuration of controllable parameters would help increase penetration rate optimize drill bit replacement time so that fewer bits consumed. In this paper, optimal tricone is formulated minimization problem solved genetic algorithm (GA). demonstrate proposed approach, effects variables on experimentally quantified methods used for optimization. Results show approach determine mines.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Development of a goal programming model for optimization of truck allocation in open pit mines

Truck and shovel operations comprise approximately 60% of the total operating costs in open pit mines. In order to increase productivity and reduce the cost of mining operations, it is essential to manage the equipment used with high efficiency. In this work, the chance-constrained goal programing (CCGP) model presented by Michalakopoulos and Panagiotou is developed to determine an optimal truc...

متن کامل

An Approach to Locate an in Pit Crusher in Open Pit Mines

Transportation costs are a significant part of capital and operating costs of large open pit mines. Cost efficiency and high reliability of in pit crushing and conveying systems compared to conventional truck-shovel system makes it more appealing to be utilized in modern mining activities. In this paper the suitable location of an in pit crusher is investigated as a single hub location problem....

متن کامل

ORE extraction and blending optimization model in poly- metallic open PIT mines by chance constrained one-sided goal programming

Determination a sequence of extracting ore is one of the most important problems in mine annual production scheduling. Production scheduling affects mining performance especially in a poly-metallic open pit mine with considering the imposed operational and physical constraints mandated by high levels of reliability in relation to the obtained actual results. One of the important operational con...

متن کامل

Determination of the largest pit with the non-negative net profit in the open pit mines

The determination of the Ultimate Pit Limit (UPL) is the first step in the open pit mine planning process. In this stage that parts of the mineral deposit that are economic to mine are determined. There are several mathematical, heuristic and meta-heuristic algorithms to determine UPL. The optimization criterion in these algorithms is maximization of the total profit whilst satisfying...

متن کامل

Monitoring systems for warning impending failures in slopes and open pit mines

Slope stability is a critical safety and production issue for mining. Major wall failure can occur seemingly without any visual warning, causing loss of lives, damage to equipment, and disruption to the mining process. Monitoring systems, ranging from simple piezometers and extensometers to highly sophisticated radars and global navigation satellite systems, are employed to predict impending in...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Bilimsel madencilik dergisi

سال: 2021

ISSN: ['2564-7024']

DOI: https://doi.org/10.30797/madencilik.847142