Driving the LHCb front-end readout

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Production and Testing of the LHCb Outer Tracker Front End Readout Electronics

The LHCb Outer Tracker is a straw drift detector with a modular design and a total of 53760 readout channels distributed over a sensitive area of 12 double layers of 6x5 m each. The main electronics readout requirement is the precise ( 0.5 ns) drift time measurement at an occupancy of ∼4% and 1 MHz readout. A total of 128 channels are read out by one Front-End box. About half of the FE−Boxes ha...

متن کامل

The Front-End electronics for the LHCb scintillating fibres detector

The LHCb detector will be upgraded during the next LHC shutdown in 2018/19 [1]. The tracker system will have a major overhaul. Its components will be replaced with new technologies in order to cope with the increased hit occupancy and radiation environment. A detector made of scintillating fibres read out by silicon photomultipliers (SiPM) is studied for this upgrade. Even if this technology ha...

متن کامل

The Final LHCb Readout Supervisor “ODIN”

The LHCb Timing and Fast Control (TFC) system is entering the final phase of prototyping. This paper proposes improvements of the main TFC modules. Since the Readout Supervisor “ODIN” is a very complex module, the prototyping was staged by starting out with a minimal version incorporating the most critical logic and then adding the remaining logic in subsequent prototypes. The paper also covers...

متن کامل

A digital Front-End Readout MIcrosystem for calorimeters at LHC

The Front-End Read-out MIcrosystem (FERMI) for calorimeters at LHC presented last year has been further developed with the aim to achieve a fu l l silicon implementation early 1994. Each microsystem will, as before, contain 9 channels with 15-16 bits dynamic range using IO-bit AD converters sampled every 15 ns. The function is accomplished by using a non-linear amplifier in front of the ADC to ...

متن کامل

A generic firmware core to drive the Front-End GBT-SCAs for the LHCb upgrade

The LHCb experiment has proposed an upgrade towards a full 40 MHz readout system in order to run between five and ten times its initial design luminosity. The entire Front-End electronics will be upgraded in order to cope with higher sub-detector occupancy, higher data rate and to work in a complete trigger-less fashion. In this paper, we describe a novel way to transmit slow control informatio...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Transactions on Nuclear Science

سال: 2004

ISSN: 0018-9499

DOI: 10.1109/tns.2004.828630