Duality-Based Algorithms for Scheduling Unrelated Parallel Machines

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Flexible flowshop scheduling with equal number of unrelated parallel machines

This article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. The objective is to minimize the makespan for a given set of jobs in the system. This problem class is NP-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. A number of test problems are randomly ge...

متن کامل

Experimental Comparison of Approximation Algorithms for Scheduling Unrelated Parallel Machines

This paper presents an empirical comparison of polynomial-time approximation algorithms and local search heuristics for the problem of minimizing total weighted completion time on unrelated parallel machines. Algorithms with a worst-case performance guarantee are based on rounding a fractional solution to an LP-rela....<ation or to a convex quadratic programming relaxation. We also investigate ...

متن کامل

Efficient Approximation Algorithms for Scheduling Unrelated Parallel Machines

Scheduling n independent jobs on m Unrelated Parallel Machines (SUM) is the problem of assigning n jobs j = 1, .., n to m machines i = 1, .., m so that each job is processed without interruption on one of the machines, and at any time, every machine processes at most one job. The objective is to minimize the makespan of the schedule. SUM is an NP-hard problem even when the number of machines is...

متن کامل

Solving a New Multi-objective Unrelated Parallel Machines Scheduling Problem by Hybrid Teaching-learning Based Optimization

This paper considers a scheduling problem of a set of independent jobs on unrelated parallel machines (UPMs) that minimizesthe maximum completion time (i.e., makespan or ), maximum earliness ( ), and maximum tardiness ( ) simultaneously. Jobs have non-identical due dates, sequence-dependent setup times and machine-dependentprocessing times. A multi-objective mixed-integer linear programmi...

متن کامل

flexible flowshop scheduling with equal number of unrelated parallel machines

this article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. the objective is to minimize the makespan for a given set of jobs in the system. this problem class is np-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. a number of test problems are randomly ge...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: ORSA Journal on Computing

سال: 1993

ISSN: 0899-1499,2326-3245

DOI: 10.1287/ijoc.5.2.192