Due-Date Assignment for Wafer Fabrication Under Demand Variate Environment

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Collaborative Fuzzy-neural Approach for Internal Due Date Assignment in a Wafer Fabrication Plant

Though many of the previous studies have been devoted to internal due date assignment in a wafer fabrication factory (wafer fab), very few among them considered the allowance added to a completion time forecast. In this way, the probability of on-time delivery is only about 50%. Methods based on confidence intervals generate completion time forecasts with very wide ranges and are not practical....

متن کامل

Product due date assignment for complex assemblies

A method is described to assign product due dates for multistage assemblies with uncertain manufacturing and assembly process times. Earliest start times of operations are specified by a predetermined production plan and processing time distributions for operations are truncated at minimum processing times. The method systematically decomposes the complex product structures of multistage assemb...

متن کامل

Due-Date Based Scheduling and Control Policies in a Multiproduct Semiconductor Wafer Fabrication Facility

This paper focuses on lot release control and scheduling problems in a semiconductor wafer fab producing multiple products that have different due dates and different process flows. For lot release control, it is necessary to determine the type of a wafer lot and the time to release wafers into the wafer fab, while it is necessary to determine sequences of processing waiting lots in front of wo...

متن کامل

Due-date performance improvement using TOC's aggregated time buffer method at a wafer fabrication factory

Due-date performance is one of the most important production indexes for success utilized by wafer fabrication factories. Traditionally, the industry sets a specific due-date tightness level and a dispatching rule based on the total processing time, the production capacity, pre-defined order release criteria and historical data, to ensure deliveries are made on-time. However, such policies typi...

متن کامل

Rule-based scheduling in wafer fabrication with due date-based objectives

Wafer fabrication is a capital-intensive and highly complex manufacturing process. In the wafer fabrication facility (fab), wafers are grouped as a lot to go through repeated sequences of operations to build circuitry. Lot scheduling is an important task for manufacturers to improve production efficiency and meet customers’ requirements of on-time delivery. In this research we propose a dispatc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Transactions on Semiconductor Manufacturing

سال: 2007

ISSN: 0894-6507

DOI: 10.1109/tsm.2007.895215