Dynamic DAG Scheduling on Multiprocessor Systems: Reliability, Energy, and Makespan

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Heterogeneous Energy and Makespan- Constrained DAG Scheduling

Energy-efficient resource allocation within computing systems is important because of the growing demand for, and cost of, energy. In this paper, we study the problem of energy-constrained static resource allocation of a collection of communicating tasks to a heterogeneous computing environment. Our goal is to maximize the probability (calculated via Monte Carlo method) that our collection of t...

متن کامل

Energy-efficient multiprocessor scheduling for flow time and makespan

We consider energy-efficient scheduling on multiprocessors, where the speed of each processor can be individually scaled, and a processor consumes power s if it runs at speed s, where α > 1. A scheduling algorithm needs to decide both processor allocations and speeds for a set of parallel jobs whose parallelism can vary with time. The objective is to minimize the sum of overall energy consumpti...

متن کامل

Pre-scheduling and Scheduling of Task Graph on Homogeneous Multiprocessor Systems

Task graph scheduling is a multi-objective optimization and NP-hard problem. In this paper a new algorithm on homogeneous multiprocessors systems is proposed. Basically, scheduling algorithms are targeted to balance the two parameters of time and energy consumption. These two parameters are up to a certain limit in contrast with each other and improvement of one causes reduction in the othe...

متن کامل

Pre-scheduling and Scheduling of Task Graph on Homogeneous Multiprocessor Systems

Task graph scheduling is a multi-objective optimization and NP-hard problem. In this paper a new algorithm on homogeneous multiprocessors systems is proposed. Basically, scheduling algorithms are targeted to balance the two parameters of time and energy consumption. These two parameters are up to a certain limit in contrast with each other and improvement of one causes reduction in the othe...

متن کامل

Multiprocessor Scheduling of Dependent Tasks to Minimize Makespan and Reliability Cost Using NSGA-II

Algorithms developed for scheduling applications on heterogeneous multiprocessor system focus on a single objective such as execution time, cost or total data transmission time. However, if more than one objective (e.g. execution cost and time, which may be in conflict) are considered, then the problem becomes more challenging. This project is proposed to develop a multiobjective scheduling alg...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems

سال: 2020

ISSN: 0278-0070,1937-4151

DOI: 10.1109/tcad.2020.3013045