Earliness and tardiness scheduling problems on a batch processor

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Heuristics for Multimachine Scheduling Problems with Earliness and Tardiness Costs

W e consider multimachine scheduling problems with earliness and tardiness costs. We first analyze problems in which the cost of a job is given by a general nondecreasing, convex function F of the absolute deviation of its completion time from a (common) unrestrictive duedate, and the objective is to minimize the sum of the costs incurred for all N jobs. (A special case to which considerable at...

متن کامل

Earliness-tardiness minimization on scheduling a batch processing machine with non-identical job sizes

This paper considers a scheduling problem for minimizing the sum of the absolute deviations of completion times from the due dates of all jobs (earliness-tardiness) on a single batch processing machine. For this problem, each job has a corresponding processing time and size and all jobs have the common due date. The problem under study is NP-hard and hence a hybrid genetic algorithm based on a ...

متن کامل

A Case Study on Earliness/Tardiness Scheduling by Constraint Programming

The aim of this paper is to solve a problem on scheduling with earliness and tardiness costs using constraint programming approach, and to compare the results with the ones from the original timed automata approach. The case study, a production of lacquers, includes some real life features like operating hours or changeover times. Considering the earliness and tardiness costs of the case study,...

متن کامل

Preemption in Single Machine Earliness/Tardiness Scheduling

We consider a single machine earliness/tardiness scheduling problem with general weights, ready times and due dates. Using completion time information obtained from the optimal solution to a preemptive relaxation, we generate feasible solutions to the original non-preemptive problem. We report extensive computational results demonstrating the speed and effectiveness of this approach.

متن کامل

A Hybrid Approach to Scheduling with Earliness and Tardiness Costs

A hybrid technique using constraint programming and linear programming is applied to the problem of scheduling with earliness and tardiness costs. The linear model maintains a set of relaxed optimal start times which are used to guide the constraint programming search heuristic. In addition, the constraint programming problem model employs the strong constraint propagation techniques responsibl...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Discrete Applied Mathematics

سال: 1999

ISSN: 0166-218X

DOI: 10.1016/s0166-218x(99)00113-4