Earned Value Management Agent-Based Simulation Model

نویسندگان

چکیده

Agile project management (APM) can be defined as an iterative approach that promotes satisfying customer requirements, adjusts to change, and develops a working product in rapidly changing environments. Managers usually apply agile the projects requiring extraordinary speed flexibility their processes. Earned value (EVM) is fundamental part of establish practical measures. Often, managers use task board visually represent work on path completion. Still, managing challenging endeavor. In this paper, we propose agent-based model describing tasks within using earned assessment board. Our illustrates how EVM yields efficient method measure project’s performance by comparing actual progress against planned activities, thus facilitating formulation more accurate predicted estimations. As proof concept, leverage our implementation calculate indexes according measurement baseline (PMB) fashion.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Earned - Value Management Terminology

To the Editor: Although I enjoyed the article titled “Value-Based Software Engineering: A Case Study” (Barry Boehm and Li Guo Huang, March 2003, pp. 33-41), as a newly minted Project Management Professional and a contributor to the Project Management Institute’s Earned Value Analysis team, I was disappointed with the authors’ use of nonstandard terminology. The authors renamed the traditional t...

متن کامل

A novel earned value management model using Z-number

The earned value management (EVM) model is an essential technique for managing and forecasting project features such as scheduling and cost performances indexes. This paper presents a novel fuzzy earned-value model based on Z-number theory incorporating both the impreciseness of real life conditions and a degree of reliability through considering an expert judgment process. The latter factor ha...

متن کامل

Predicting project time and costs using earned value management based on trapezoidal fuzzy numbers

Projects include activities that must be carried out at certain dates, with specified costs and determined qualities in order to satisfy the stakeholders. Project control is one of the most important and widely used issues in project-based organizations and it has attracted a lot of attention. So far, in the field of project control, there have been a lot of research that were done in different...

متن کامل

A time-cost trade-off model by incorporating fuzzy earned value management: A statistical based approach

Time–cost trade-off problems (TCT) are well-known in project management contents. This approach normally applied for scheduling of a project especially where the project should be completed under pre-determined deadline. This paper aims to extend time-cost trade-off (TCT) problems in order to provide a well-organized mechanism for both scheduling and rescheduling processes of a project. The pro...

متن کامل

An Agent-Based Collaborative Model For Supply Chain Management Simulation

In traditional supply chain (SC), planning problems are usually considered individually at each SC entity. However, such decisions often influence the other members in the chain and thus an integrated approach should be considered. By modelling system-wide SC networks, different SC problems, like production planning, coordination, order distribution, among others, can be integrated and solved s...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Systems

سال: 2023

ISSN: ['2079-8954']

DOI: https://doi.org/10.3390/systems11020086