Earned value‐based performance monitoring of facility construction projects
                    
                        
                            نویسندگان
                            
                            
                        
                        
                    
                    
                    چکیده
منابع مشابه
The Cost Monitoring of Construction Projects Through Earned Value Analysis
In construction industry, the term ‘procurement’ is considered as a project based job where clients and contractors are always keen to observe performance indicators. These indicators represent financial and non-financial efficiency of project activities. Among these, the monitoring of financial indicators is an important function of project management. Therefore, during the construction phase,...
متن کاملEstablishing Control Limits on Time Performance Indicators of Projects through Monte Carlo Simulation and Earned Duration Management
Earned Duration Management (EDM) method has been developed to enhance Earned Value Management and to solve some of its problems, such as separation of measuring time and cost dimensions. By providing performance indicators, this method makes it possible for managers to accurately measure the progress of a project and to calculate the time and cost required to complete it. Nevertheless, the acce...
متن کاملA time-dependent earned value model for software projects
This paper proposes a formal method for including time dependence into Earned Value (EV) management. The model requires three parameters, which map directly to the fundamental “triple constraint” of scope, cost, and schedule: the reject rate of activities, the cost overrun parameter, and the time to repair the rejected activities. Time dependent expressions for the planned value, earned value, ...
متن کاملInvestigating the Impact of Safety Investment on Safety Culture in Construction Projects - Case Study of Power Plant Construction Projects
Background and aims: Construction industry is known as one of the most perilous industries in that it is involving the hazardous projects as well as the high manpower activities correlating with a high rate of work-related accidents. On the other hand, the high rate of accidents in the industry demanding a big budget for the damages; therefore, safety is strongly emphasized in the construction ...
متن کاملEffects of Collaboration in Projects on Construction Project Performance
Collaboration among project actors has been subjected to much attention in recent years within the field of construction management. Several case studies support the argument that collaboration has positive effects on project performance. There is however, a need for quantitative studies investigating statistical relationships between collaboration and performance. Joint activities and collabor...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Facilities Management
سال: 2013
ISSN: 1472-5967
DOI: 10.1108/14725961311301475