Effects of the Inba Clinical Pathway for Local Stroke Network as a Stroke Liaison Critical Pathway

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Stroke mimics in patients with clinical signs of stroke

Background: Stroke mimic is a major diagnostic challenge and may be difficult to distinguish from real strokes. The aim of this study was to evaluate the relative frequency of stroke mimics in patients with clinical signs of stroke. Methods: In this cross sectional-study, the medical records of 1985 patients with stroke admitted to Poursina Hospital were enrolled using the census technique. ...

متن کامل

critical period effects in foreign language learning:the influence of maturational state on the acquisition of reading,writing, and grammar in english as a foreign language

since the 1960s the age effects on learning both first and second language have been explored by many linguists and applied linguists (e.g lennerberg, 1967; schachter, 1996; long, 1990) and the existence of critical period for language acquisition was found to be a common ground of all these studies. in spite of some common findings, some issues about the impacts of age on acquiring a second or...

15 صفحه اول

the differential effects of debate and media analysis as relate to enhancing efl learners critical thinking ability and writing performances

critical thinking ability has an important role in education. accordingly, scholars around the world are searching for new ways for teaching and improving students critical thinking ability. in line with the studies in efl contexts supporting the positive relationship between critical thinking and writing performances, this study investigated the differential effects of halverson’s critical thi...

15 صفحه اول

Effect of the Performance of the Liaison Nurses on the Motor Complications in Stroke Patients after Discharge: A Randomized Clinical Trial

Background & Aims: Despite the rapid prevention, diagnosis, and management of stroke, the patients are still at a high risk of complications. From hospital admission to discharge and at home, liaison nurses help the patients with the complicated care issues caused by stroke. The present study aimed to investigate the effect of the performance of liaison nurses on the incidence of motor complica...

متن کامل

For whom the desert bell tolls: heat stroke or stroke

       Heat stroke is the most complicated and dangerous amongst heat injuries that can lead to irreversible injury and even death with itself or with creating predisposibility to different diseases. The following case report depicts a patient who presented primarily with impairment of consciousness after walking 45 km in the summer heat to cross the Syria-Turkey border and la...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Nihon Ika Daigaku Igakkai Zasshi

سال: 2012

ISSN: 1349-8975,1880-2877

DOI: 10.1272/manms.8.246