Efficient single-step time-dependent analysis of PC structures
نویسندگان
چکیده
منابع مشابه
Analysis of a time-dependent fluid-structure interaction problem in an optimal control framework over a single time-step
Fluid-structure interaction simulation presents many computational difficulties, particularly when the densities of the fluid and structure are close. A previous report [20] has suggested that recasting the FSI problem in the context of optimal control may significantly reduce computation time. This report introduces a Neumann type control along with detailed analysis for the stability and exis...
متن کاملTime dependent trust structures
The correct functioning of distributed IT-systems requires elaborate and efficient ways to control the user’s access to the system. Traditional global or hierarchical access control systems are not suitable for distributed systems with autonomous components, where each component needs to dynamically maintain and enforce its own access control policy. Furthermore, the potential participants are ...
متن کاملA Modified Multi Time Step Integration for Dynamic Analysis
In this paper new implicit higher order accuracy (N-IHOA) time integration based on assumption of constant time step is presented for dynamic analysis. This method belongs to the category of the multi time step integrations. Here, current displacement and velocity are assumed to be functions of the velocities and accelerations of several previous time steps, respectively. This definition causes...
متن کاملTime Dependent Analysis of Micro-tubes Conveying Nanofluids Under Time-Varying Heat Flux
In this paper the numerical analysis of flow and time dependent heat transfer of micro-tube conveying nanofluid in laminar flow is investigated. In this study, convection heat transfer of nanofluid and base fluid and transient analysis for time-varying heat flux for time step of 0.0001 second are elucidated. It is observed that the pumping power of nanofluid flowing and the maximum temperatur...
متن کاملSingle-machine scheduling considering carryover sequence-dependent setup time, and earliness and tardiness penalties of production
Production scheduling is one of the very important problems that industry and production are confronted with it. Production scheduling is often planned in the industrial environments while productivity in production can improve significantly the expansion of simultaneous optimization of the scheduling plan. Production scheduling and production are two areas that have attracted much attention in...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Proceedings of the Institution of Civil Engineers - Engineering and Computational Mechanics
سال: 2012
ISSN: 1755-0777,1755-0785
DOI: 10.1680/eacm.10.00030