Electric Power System Planning under Uncertainty Using Inexact Inventory Nonlinear Programming Method

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A two-stage inexact-stochastic programming model for planning carbon dioxide emission trading under uncertainty

In this study, a two-stage inexact-stochastic programming (TISP) method is developed for planning carbon dioxide (CO2) emission trading under uncertainty. The developed TISP incorporates techniques of interval-parameter programming (IPP) and two-stage stochastic programming (TSP) within a general optimization framework. The TISP can not only tackle uncertainties expressed as probabilistic distr...

متن کامل

Optimal Operations Planning under Uncertainty by Using Probabilistic Programming

Due to the lack of systematic reliability analysis, intuitive decisions can usually be made in planning process operations under uncertainty. We propose a new analysis and optimization framework to address this problem. By using the technique of probabilistic programming, the solution provides comprehensive information on profit as a function of the confidence level as well as its sensitivities...

متن کامل

An inexact-restoration method for nonlinear bilevel programming problems

We present a new algorithm for solving bilevel programming problems without reformulating them as single-level nonlinear programming problems. This strategy allows one to take profit of the structure of the lower level optimization problems without using non-differentiable methods. The algorithm is based on the inexact-restoration technique. Under some assumptions on the problem we prove global...

متن کامل

Planning renewable energy in electric power system for sustainable development under uncertainty ¬タモ A case study of Beijing

An interval type-2 fuzzy fractional programming (IT2FFP) method is developed for planning the renewable energy in electric power system for supporting sustainable development under uncertainty. IT2FFP can tackle output/input ratio problems where complex uncertainties are expressed as type-2 fuzzy intervals (T2FI) with uncertain membership functions. The IT2FFP method is then applied to planning...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Environmental Informatics

سال: 2013

ISSN: 1726-2135,1684-8799

DOI: 10.3808/jei.201300245