Electrical machines-based multi-disturbance device for testing distribution grid technologies
نویسندگان
چکیده
منابع مشابه
Parallel Disturbance Force Compensator for Electrical Machines
The objective of the research is to diminish unwanted forces generated by rotation and unbalanced rotor mass on the rotor of an electrical machine. These forces, dependent on rotational speed, cause vibration that, when occurring in the machine’s natural frequency, causes severe problems. Extra windings are built in the stator of the machine, and they are supplied with current to create an oppo...
متن کاملDistribution Grid Planning Considering Smart Grid Technologies
Connection of distributed generation (DG) units, energy storages, and new loads into low voltage (LV) grids leads to a constrained operation of the grids. Consequently, voltage limits violation and overloading of grid assets occur more frequently. To tackle these issues, distribution system operators (DSO) still employ traditional techniques in planning distribution grids to increase grid hosti...
متن کاملHYPOTHESIS TESTING FOR AN EXCHANGEABLE NORMAL DISTRIBUTION
Consider an exchangeable normal vector with parameters ????2, and ?. On the basis of a vector observation some tests about these parameters are found and their properties are discussed. A simulation study for these tests and a few nonparametric tests are presented. Some advantages and disadvantages of these tests are discussed and a few applications are given.
متن کاملObservations in Using Grid Technologies for Multi-objective Optimization
Solving optimization problems that involve two or more objective functions is of great interest in disciplines such as engineering and economics. Since real-world multi-objective optimization problems (MOPs) usually are very complex, grid computing appears as a powerful technology to solve these kinds of problems. However, few attention has been paid to this issue in the multi-objective optimiz...
متن کاملPareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times
This paper addresses an unrelated multi-machine scheduling problem with sequence-dependent setup time, release date and processing set restriction to minimize the sum of weighted earliness/tardiness penalties and the sum of completion times, which is known to be NP-hard. A Mixed Integer Programming (MIP) model is proposed to formulate the considered multi-criteria problem. Also, to solve the mo...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Electrical Power & Energy Systems
سال: 2018
ISSN: 0142-0615
DOI: 10.1016/j.ijepes.2017.12.030