Energy and capital targets for constrained heat exchanger networks

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

COST OPTIMUM HEAT EXCHANGER NETWORKS-l. MINIMUM ENERGY AND CAPITAL USING SIMPLE MODELS FOR CAPITAL COST

An important feature of heat exchanger network design is the energy-capital tradeoff. This tradeoff has been regarded as complex due to the number of structural network alternatives usually available, each being subject to continuous optimization. Current procedures tend to first identify minimum energy networks. The total cost (capital and energy) can then be improved by evolution and continuo...

متن کامل

Area Energy and Throughput Targeting in Debottlenecking of Heat Exchanger Networks with Decomposition Approach

For energy saving retrofit projects, its economics are usually evaluated in terms of capital investment and payback time. The capital investment is in direct relation to the total heat recovery area of the network and the payback time factor is base on both the area and the energy savings. The debottlenecking is an increased throughput, which can be profitable in economic sense. The combination...

متن کامل

LEBRP - A Lightweight and Energy Balancing Routing Protocol for Energy-Constrained Wireless Ad Hoc Networks

A wireless ad hoc network typically refers to any set of wireless networks where all devices have equal status on a network and are free to associate with any other wireless ad hoc network devices in their range. As the nature of these networks, they commonly do not have external power supplies, and each node has a limited internal power source. In this paper, we put forward a new routing proto...

متن کامل

Synthesis of Heat Exchanger Networks for Controllability

Heat exchanger networks are widely employed in the chemical processing industries to recover energy, resulting in reduced operating costs. Several methodologies can be found in the literature for the design of heat exchanger networks. Typical criteria are maximum energy recovery and minimum heat transfer area. However, the heat integration of process streams can lead to process structures that ...

متن کامل

area energy and throughput targeting in debottlenecking of heat exchanger networks with decomposition approach

for energy saving retrofit projects, its economics are usually evaluated in terms of capital investment and payback time. the capital investment is in direct relation to the total heat recovery area of the network and the payback time factor is base on both the area and the energy savings. the debottlenecking is an increased throughput, which can be profitable in economic sense. the combination...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Brazilian Journal of Chemical Engineering

سال: 2000

ISSN: 0104-6632

DOI: 10.1590/s0104-66322000000400030