Energy Conservation and Gravitational Wavelength Effect of the Gravitational Propagation Delay Analysis

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Energy Conservation at the Gravitational Collapse

We apply the principle of energy conservation to the motion of the test particle in gravitational field by requiring that its energy, gained by gravitation, has to be balanced by decrease of its rest mass. Due to the change of mass in gravitational field Newton's force law between gravitating bodies is modified, too. With this modified force law we build up the the classical field theory of gra...

متن کامل

Energy Density and Pressure of Long Wavelength Gravitational Waves

Inflation leads us to expect a spectrum of gravitational waves (tensor perturbations) extending to wavelengths much bigger than the present observable horizon. Although these gravity waves are not directly observable, the energy density that they contribute grows in importance during the radiationand dust-dominated ages of the universe. We show that the back reaction of tensor perturbations dur...

متن کامل

On the Convergence Analysis of Gravitational Search Algorithm

Gravitational search algorithm (GSA) is one of the newest swarm based optimization algorithms, which has been inspired by the Newtonian laws of gravity and motion. GSA has empirically shown to be an efficient and robust stochastic search algorithm. Since introducing GSA a convergence analysis of this algorithm has not yet been developed. This paper introduces the first attempt to a formal conve...

متن کامل

On the Convergence Analysis of Gravitational Search Algorithm

Gravitational search algorithm (GSA) is one of the newest swarm based optimization algorithms, which has been inspired by the Newtonian laws of gravity and motion. GSA has empirically shown to be an efficient and robust stochastic search algorithm. Since introducing GSA a convergence analysis of this algorithm has not yet been developed. This paper introduces the first attempt to a formal conve...

متن کامل

Gravitational Energy

Observers at rest in a stationary spacetime flat at infinity can measure small amounts of rest-mass+internal energies+kinetic energies+pressure energy in a small volume of fluid attached to a local inertial frame. The sum of these small amounts is the total “matter energy” EM for those observers. If Mc 2 is the total mass-energy, the difference Mc − EM is the binding gravitational energy. Misne...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Applied Mathematics and Physics

سال: 2017

ISSN: 2327-4352,2327-4379

DOI: 10.4236/jamp.2017.54080