Engineering Change Orders Design Using Multiple Variables Linear Programming for VLSI Design

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A linear programming-based algorithm for floorplanning in VLSI design

In this paper, we consider a floorplanning problem in the physical design of very large scale integration. We focus on the problem of placing a set of blocks (modules) on a chip with the objective of minimizing area of the chip as well as total wire length. The blocks have different areas and their shapes are either fixed (predetermined) or flexible (to be determined). We use the sequence-pair ...

متن کامل

Algorithm Engineering and VLSI Design

The task of producing a VLSI architecture that will solve a given problem contains many design decisions. The eeects of these decisions on the nal design are often diicult to quantify. We will compare three diierent implementations of a systolic architecture for solving the knapsack problem using the dynamic programming method. The design decisions involved and the \engineering" of the algorith...

متن کامل

Using Logic Programming and Coroutining for VLSI Design

We show how an extended Prolog can be exploited to implement different electronic CAD tools. Starting with a computer hardware description language (CHDL) several problems like digital circuit analysis, simulation and code generation for programmable microprocessors are discussed. For that purpose a part of the MIMOLA (machine independent micropro-gramming language) system MSS (MIMOLA hardware ...

متن کامل

Optimal Designs for Generalized Linear Models with Multiple Design Variables

Binary response experiments are very common in scientific studies. However, the study of optimal designs in this area is in a very underdeveloped stage. Sitter and Torsney (1995a) studied optimal designs for binary response experiments with two design variables. In this paper, we consider a general situation with multiple design variables. A novel approach is proposed to identify optimal design...

متن کامل

Minimax Input Shaper Design Using Linear Programming

The focus of this paper is on the design of robust input shapers where the maximum value of the cost function over the domain of uncertainty is minimized. This nonlinear programming problem is reformulated as a linear programming problem by approximating a n-dimensional hypersphere with multiple hyperplanes (as in a geodesic dome). A recursive technique to approximate a hypersphere to any level...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: VLSI Design

سال: 2014

ISSN: 1065-514X,1563-5171

DOI: 10.1155/2014/698041