Engineering method for determining rational fire protection parameters of warehouses
نویسندگان
چکیده
منابع مشابه
Requirements Engineering for Data Warehouses
Data Warehouses (DWs) aim at supporting the decision-making process of an organization. In the Requirements Engineering (RE) domain, several methods were proposed for the development of DWs, most of them based on the Goal-Oriented Requirements Engineering (GORE) approach. However, there is not yet a comprehensive and unified perspective of the various methods proposed. In this paper, a coherent...
متن کاملanalyzing the risk of fire in a hospital complex by “fire risk assessment method for engineering” (frame)
aims: the occurrence of fire in residential buildings , commercial complexes and large and small industries cause physical, environmental and financial damages to many different communities. fire safety in hospitals is sensitive and it is believed that the society takes the responsibility to care sick people . the goal of this study was to use fire risk assessment method for engineering (frame)...
متن کاملCollaborative Fire Protection Engineering Based on Software Agents
This paper presents a new approach with software agents to support the task of preventive fire protection engineering. Agents are stationary or mobile software components to support the user in his planning tasks according to their specific design. Agents can act autonomously within their environment, which means that they can solve problems without the need of control through a human being or ...
متن کاملDetermining Stochastic Parameters Using an Unified Method
The estimation accuracy is mostly affected by the time-dependent growth of inertial sensor errors, especially the stochastic errors. In order to eliminate negative effect of these random errors, they must be accurately modelled. Usually the stochastic models are based by the 1 or 2 Gauss-Markov models, where the key is the successful implementation that depends on how well the noise statistics ...
متن کاملtechnical and legal parameters for determination of river boundary,( case study haraz river)
چکیده با توسعه شهر نشینی و دخل و تصرف غیر مجاز در حریم رودخانه ها خسارات زیادی به رودخانه و محیط زیست اطراف آن وارده می شود. در حال حاضر بر اساس آئین نامه اصلاح شده بستر و حریم رودخانه ها، حریم کمی رودخانه که بلافاصله پس از بستر قرار می گیرد از 1 تا20 متر از منتهی الیه طرفین بستر رودخانه تعیین، که مقدار دقیق آن در هر بازه از رودخانه مشخص نیست. در کشورهای دیگر روشهای متفاوتی من جمله: درصد ریسک...
15 صفحه اولذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Eastern-European Journal of Enterprise Technologies
سال: 2020
ISSN: 1729-4061,1729-3774
DOI: 10.15587/1729-4061.2020.201819