Enhanced Plant Restoration in Open-Pit Mines Using Maize Straw and Ultrasonically Pre-Treated Coal Fly Ash
نویسندگان
چکیده
منابع مشابه
Use of fly-ash slurry in backfill grouting in coal mines
Cave backfill grouting implies grouting of the caving rock mass prior to it being compacted. The filling materials strengthen the caving rock and support the overlying strata to achieve the purpose of slowing down the surface subsidence. The broken roof will fail and collapse during mining operations performed without appropriate supporting measures being taken. It is difficult to perform conti...
متن کاملAn Approach to Locate an in Pit Crusher in Open Pit Mines
Transportation costs are a significant part of capital and operating costs of large open pit mines. Cost efficiency and high reliability of in pit crushing and conveying systems compared to conventional truck-shovel system makes it more appealing to be utilized in modern mining activities. In this paper the suitable location of an in pit crusher is investigated as a single hub location problem....
متن کاملThe respiratory toxicity of coal fly ash
The aim of this study was to compare the relative respiratory toxicity of CFA samples obtained from three Chinese coal-burning power stations to CFA obtained from a UK coal-burning power station; both bulk and respirable PM10 samples were tested. In order to elucidate CFA toxicity, a multi-disciplinary approach was taken, thereby considering geochemical aspects of the fly ash as well as biochem...
متن کاملKnowledge-Enhanced CO-monitoring in Coal-Mines
Detection of underground res is an important security task in hard-coal mining. Automated re detection systems are usually based on the monitoring of carbon monoxide (CO). Systems using conventional technology based on threshold and tendency observations, however, generate a large number of false alarms. We show how CO-concentrations can be forecast by appropriate models of the physical and che...
متن کاملDetermination of Ultimate Pit Limits in Open Mines Using Real Option Approach
Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price. Metal price fluctuations in recent years were exaggerated and impose...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Sustainability
سال: 2020
ISSN: 2071-1050
DOI: 10.3390/su12229307