Equity and network-level maintenance scheduling
نویسندگان
چکیده
منابع مشابه
Bi-level Model for Reliability based Maintenance and Job Scheduling
Many defects in manufacturing system are caused by human resources that show the significance of the human resources in manufacturing systems. Most manufacturers attempt to investigate the human resources in order to improve the work conditions and reduce the human error by providing a proper work-rest schedule. On the other hand, manufacturer deal with machine scheduling based on demand and wo...
متن کاملHuman resources scheduling based on machines maintenance planning and human reliability level
In today's competitive market, quality has an important role in manufacturing system. The manufacturers attempt to maintain their production system in a proper condition to produce high quality products. One of the key factors to achieve this goal is maintenance policy. Most studies on maintenance focused on machines and less attention has been paid to human resources as the most important fact...
متن کاملLong Term Cost Effective Preventive Maintenance Scheduling
Preventive maintenance scheduling of generating units is addressed as a long-term scheduling in power system studies aiming to increase the reliability incorporating cost reduction. It consists of knowing which generating units should be shut down for regular safety inspection. In this paper, a new formulation of preventive maintenance scheduling associated with cost reduction index (CRI) is pr...
متن کاملhuman resources scheduling based on machines maintenance planning and human reliability level
in today's competitive market, quality has an important role in manufacturing system. the manufacturers attempt to maintain their production system in a proper condition to produce high quality products. one of the key factors to achieve this goal is maintenance policy. most studies on maintenance focused on machines and less attention has been paid to human resources as the most important...
متن کاملAn IP-level Network Monitor and Scheduling System for Clusters
Current systems for managing workload on clusters of workstations, particularly those available for Linux-based (Beowulf) clusters, are typically based on traditional process-based, coarse-grained parallel and distributed programming. The DESPOT project is building a sophisticated thread-level resource-monitoring system for computational, storage and network resources based on SGI’s Performance...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: EURO Journal on Transportation and Logistics
سال: 2015
ISSN: 2192-4376
DOI: 10.1007/s13676-015-0075-7