Estimate of geohydrodynamic mode in operation of open pit mines in Almalyk ore field

نویسندگان

چکیده

With a view to safe open pit mining, the anticipated water inflows in during construction are estimated. A geopermeation model is built for whole Almalyk or field. The numerical modeling of mining used Groundwater Modeling System (GMS) as most widely applied software system wide-range problem solution practical hydrogeology. test ore field features difficult geological and hydrological conditions (multilayered structure water-containing stratum, horizontal vertical lithological facial variability aquifers impermeable beds which hydraulically interconnected varying degree, local extension this variability). determines that groundwater level within limits mines conforms with general laws fluid flow minimum levels valleys maximum values at watersheds on hillslopes. computer-aided enables more carful calculation add analytical research, makes it possible gain insight into essence an object, its peculiarities regular patterns often indistinguishable without modeling. studies allow confident affirmation hydrogeological images all major mechanisms ground adjacent areas, applicable predictions. latter can help immediately respond changes behavior eliminate failure service facilities territories.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Implementation of Hyperbolic Tangent Function to Estimate Size Distribution of Rock Fragmentation by Blasting in Open Pit Mines

Rock fragmentation is one of the desired results of rock blasting. So, controlling and predicting it, has direct effects on operational costs of mining. There are different ways that could be used to predict the size distribution of fragmented rocks. Mathematical relations have been widely used in these predictions. From among three proposed mathematical relations, one was selected in this stud...

متن کامل

Determination of the largest pit with the non-negative net profit in the open pit mines

The determination of the Ultimate Pit Limit (UPL) is the first step in the open pit mine planning process. In this stage that parts of the mineral deposit that are economic to mine are determined. There are several mathematical, heuristic and meta-heuristic algorithms to determine UPL. The optimization criterion in these algorithms is maximization of the total profit whilst satisfying...

متن کامل

An Approach to Locate an in Pit Crusher in Open Pit Mines

Transportation costs are a significant part of capital and operating costs of large open pit mines. Cost efficiency and high reliability of in pit crushing and conveying systems compared to conventional truck-shovel system makes it more appealing to be utilized in modern mining activities. In this paper the suitable location of an in pit crusher is investigated as a single hub location problem....

متن کامل

ORE extraction and blending optimization model in poly- metallic open PIT mines by chance constrained one-sided goal programming

Determination a sequence of extracting ore is one of the most important problems in mine annual production scheduling. Production scheduling affects mining performance especially in a poly-metallic open pit mine with considering the imposed operational and physical constraints mandated by high levels of reliability in relation to the obtained actual results. One of the important operational con...

متن کامل

Scheduling in iron ore open-pit mining

During the last few years, most production-based businesses have been under enormous pressure to improve their top-line growth and bottom-line savings. As a result, many companies are turning to systems and technologies that can help optimise their supply chain activities. In this paper, we discuss a real-world application of scheduling in the mining industry. This is a highly constrained probl...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Gornyi Zhurnal

سال: 2021

ISSN: ['0017-2278', '2413-9793']

DOI: https://doi.org/10.17580/gzh.2021.09.13