Estimating processes of smaller builders

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Paxos for System Builders

This paper presents a complete specification of the Paxos replication protocol such that system builders can understand it and implement it. We evaluate the performance of a prototype implementation and detail the safety and liveness properties guaranteed by our specification of Paxos.

متن کامل

Estimating deformations of stationary processes

This paper studies classes of nonstationary processes, such as warped processes and frequency-modulated processes, that result from the deformation of stationary processes. Estimating deformations can often provide important information about an underlying physical phenomenon. A computational harmonic analysis viewpoint shows that the deformed autocovariance satisfies a transport equation at sm...

متن کامل

The Unnoticed Reef Builders

M, -ost divers, photographers and snorkelers ignore a vital part of the reef life when diving. Many people, attracted by the movement of bright colored tropical fish, crustaceans lurking under rocks or the spectacular forms of colorful corals, overlook the starting point in the food chain, the plants. Without plant life to convert food energy from sunlight, there would be no animals. Herbivores...

متن کامل

From Builders to Bankers

The notion of business development as a partial cure to the economic condition of blacks is not a new one, but black leaders have never unanimously agreed that business ownership is an effective instrument of economic success. The violence and civil disorders of the 1960s, however, spurred strong interest in programs to develop and promote both urban black business and black-owned and controlle...

متن کامل

Users and Builders

When I had the pleasure of visiting the Cosmotron at Brookhaven in 1956 I took some statistics on the conversations in the hall. I found that 10 per cent was small talk, 25 pe, cent was about physics, and 65 per cent was about Scheduling. T’lese percen ages uive 3’. indication that even at that time the social problems of high-energy physics appeared to take precedence over the subject itself, ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Construction Management and Economics

سال: 1994

ISSN: 0144-6193,1466-433X

DOI: 10.1080/01446199400000020