Estimation of Project Completion Time and Factors Analysis for Concurrent Engineering Project Management: A Simulation Approach

In concurrent engineering projects, tasks are usually interdependent among each other that require much iteration before completion where the critical path method/program evaluation and review technique (CPM/PERT) may not be applicable to help estimate the project duration. In addition, carrying out a large-scaled project in a dynamic environment has to deal with various factors at the same tim...

متن کامل

Management: a Simulation Approach Estimation of Project Completion Time and Factors Analysis for Concurrent Engineering Project Estimation of Project Completion Time and Factors Analysis for Concurrent Engineering Project Management: a Simulation Approach

In concurrent engineering projects, tasks are usually interdependent among each other that require much iteration before completion where the critical path method/program evaluation and review technique (CPM/PERT) may not be applicable to help estimate the project duration. In addition, carrying out a large-scaled project in a dynamic environment has to deal with various factors at the same tim...

متن کامل

Time Estimation for Project Management Life Cycle: A Simulation Approach

The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives. Regardless of scope or complexity, any project goes through a series of stages during its life. Project development has increased importance in business due to stiff competition and a fast changing business environment. Its cycle time is critical as it decides the success of a busi...

متن کامل

Concurrent Software Engineering Project

Concurrent engineering or overlapping activities is a business strategy for schedule compression on large development projects. Design parameters and tasks from every aspect of a product’s development process and their interdependencies are overlapped and worked on in parallel. Concurrent engineering suffers from negative effects such as excessive rework and increased social and communication c...

متن کامل

A Systems Dynamics Model for Project Management systems of Project-Based Organization

It is obvious that the success of a project-based organization is dependent on its projects. A variety of tools such as the project excellence model, project management maturity models, the earned value method, have been developed in this regard, but there are still delays in projects because the projects have dynamic nature with non-linear relationships and feedback processes during the projec...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Concurrent Engineering

سال: 2006

ISSN: 1063-293X,1531-2003

DOI: 10.1177/1063293x06072482