Evaluation model of coal mine emergency rescue resource allocation based on weight optimization TOPSIS method

نویسندگان

چکیده

Abstract In order to solve the problems of unreasonable allocation and low efficiency emergency rescue resources in coal mine accidents, it is necessary establish a resource model by using comprehensive weight-approximation ideal solution (TOPSIS method).This paper takes rock burst as an example extending this designed plan. Firstly, calculated weight evaluation index affecting selected AHP method entropy respectively. Then optimization inspired method. Finally, optimal scheme TOPSIS method, verified approaching solution. The results shows that: (1) There are two influencing factors have great effect on model, which time advance channel; (2) program 5 through solution, consistent with actual situation project, indicating that has high reliability.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Immune Optimization of Path Planning for Coal Mine Rescue Robot

In order to further improve the ability of global path planning of coal mine rescue robot in the complex environment, a bacterial foraging algorithm-based polyclonal selection algorithm (BFA-PSA) is proposed. In order to verify the superiority of the BFA-PSA, the proposed algorithm is tested by traveling salesman problem (TSP) and compared with genetic algorithm (GA) and clonal selection algori...

متن کامل

Coal Mine Safety Evaluation Method Based on Incomplete Labeled Data Stream Classification

Monitoring data in coal mine is essentially data stream, and missing coal mine monitoring data is caused by harsh coal mine environment, therefore coal mine safety evaluation can be seen as incomplete labeled data stream classification. The method is proposed for unlabeled data and concept drift in incomplete labeled data stream in this paper that uses semi-supervised learning method based on k...

متن کامل

Resource Allocation Optimization in Critical Chain Method

The paper presents resource allocation optimization in Critical Chain Project Management (CCPM). The cheapest project schedule is searched with respect to time constraints. The algorithm originally developed for the hardware-software co-design of heterogeneous distributed systems is adapted to work with human resources and CCPM method. The results of the optimization showed significant efficien...

متن کامل

mortality forecasting based on lee-carter model

over the past decades a number of approaches have been applied for forecasting mortality. in 1992, a new method for long-run forecast of the level and age pattern of mortality was published by lee and carter. this method was welcomed by many authors so it was extended through a wider class of generalized, parametric and nonlinear model. this model represents one of the most influential recent d...

15 صفحه اول

Model-based evaluation of long-range resource allocation plans

When corporate planning is decentralized, the plans produced by each suborganization must be reviewed and evaluated to make sure they are reasonable and acceptable to the organization as a whole. In this paper we consider three ways of automating the evaluation task: two based on rules combined with qualitative arithmetic, and one based on a microeconomic model combined with quantitative reason...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IOP conference series

سال: 2021

ISSN: ['1757-899X', '1757-8981']

DOI: https://doi.org/10.1088/1755-1315/651/3/032106