EVALUATION OF THE EFFECT OF RESOURCE CIRCULATION BY AN ALTERNATIVE RECYCLING TECHNOLOGY-COMPARISON BETWEEN HORIZONTAL RECYCLING AND CASCADE RECYCLING OF WOOD RESOURCE-

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

examining the relationship between fear of negative evaluation and communication strategies by iranian efl learners

the purpose of the present study was to investigate the relationship between fear of negative evaluation (fne) and communication strategies (css) among iranian efl learners. it was aimed to examine the differences in the use of communication strategies between speakers with high or low degree of fear of negative evaluation. the current study was a case study consisting of 10 english learners at...

chemical recycling of polycarbonate waste using conventional heating and microwave assisted method

پلی کربنات یکی از پلاستیکهای مهمی است که به صورت گسترده در تولید لوحهای فشرده، قطعات رایانه، مواد ساختمانی و غیره مورد استفاده قرار می گیرد. این پلیمر بصورت عمده از تراکم مونومر بیس فنولa (bpa) و کربنیل کلرید یا دی متیل کربنات ها بدست می آید. در سالهای اخیر بازیافت شیمیایی پلی کربنات بیشتر مورد توجه بوده است. بازیافت شیمیایی پلی کربنات برای بدست آوردن مواد اولیه آن با روشهای متفاوتی مانند تجزی...

the evaluation of language related engagment and task related engagment with the purpose of investigating the effect of metatalk and task typology

abstract while task-based instruction is considered as the most effective way to learn a language in the related literature, it is oversimplified on various grounds. different variables may affect how students are engaged with not only the language but also with the task itself. the present study was conducted to investigate language and task related engagement on the basis of the task typolog...

15 صفحه اول

Resource-constrained flowshop scheduling with separate resource recycling operations

This paper considers the relocation problem arising from public re-development projects cast as a two-machine flowshop scheduling problem. In such a project, some buildings need to be torn down and re-constructed. The two processes of tearing down and re-constructing each building are often viewed as a single operation. However, under certain circumstances, the re-construction process, i.e., th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: ENVIRONMENTAL SYSTEMS RESEARCH

سال: 2008

ISSN: 1345-9597,1884-8125

DOI: 10.2208/proer.36.275