Extension of Time Claim Assessment in Malaysian Construction Industry: Views from professionals
نویسندگان
چکیده
منابع مشابه
Attentiveness of Building Commissioning in the Malaysian Construction Industry
This paper provides some thoughts about the lack of attentiveness of building commissioning in the construction industry and the lack of handling in project commissioning as an integral part of the project life-cycle. Many have perceived commissioning as the problem solving process of a project, rather than the start up of the equipment, or the handing over of the project to the client. Therefo...
متن کاملRisk of Late Payment in the Malaysian Construction Industry
The purpose of this study is to identify the underlying causes of late payment from the contractors’ perspective in the Malaysian construction industry and to recommend effective solutions to mitigate late payment problems. The target groups of respondents in this study were Grades G3, G5, G6 and G7 contractors with specialization in building works and civil engineering works registered with th...
متن کاملAccidents in Malaysian construction industry: statistical data and court cases.
Safety and health issues remain critical to the construction industry due to its working environment and the complexity of working practises. This research attempts to adopt 2 research approaches using statistical data and court cases to address and identify the causes and behavior underlying construction safety and health issues in Malaysia. Factual data on the period of 2000-2009 were retriev...
متن کاملRisk assessment model selection in construction industry
Construction industry faces a lot of inherent uncertainties and issues. As this industry is plagued by risk, risk management is an important part of the decision-making process of these companies. Risk assessment is the critical procedure of risk management. Despite many scholars and practitioners recognizing the risk assessment models in projects, insufficient attention has been paid by resear...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Asian Journal of Environment-Behaviour Studies
سال: 2018
ISSN: 2514-751X
DOI: 10.21834/aje-bs.v3i10.310