External Consultant Involvement for Organizational Capability Building in Complex Construction Projects: A Perspective from Interorganizational Learning Process

نویسندگان

چکیده

External management consultants have been increasingly employed by owners of complex construction projects (CCPs) to foster innovation and improve their organizational capability. However, the dynamics owner-consultant collaboration process in such are still unknown. To bridge this gap, paper explores roles external consultant involvement fostering developing an capability CCPs. Based on survey data collected from 102 across different types China, partial least square-structural equation modeling analysis results uncover positive effect creating building In particular, mediating role is identified exploration transformation learning processes with involved. The findings study provide a novel explanation for creation CCPs through useful guidance project better identify utilize future.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Effects of IT Capability and External Integration on Organizational Responsiveness: an Organizational Learning Perspective

Drawing upon the organizational learning perspective, this study focuses on the relationship between external integration and organizational responsiveness, and how such relationship is moderated by three kinds of information technology (IT) capability (i.e. inside-out, outside-in, spanning). The results of 197 firms in China reveal the positive relationship between external integration and org...

متن کامل

User involvement in Swedish residential building projects: a stakeholder perspective

One factor influencing quality in the building industry is the ability of users, such as residents, to identify and express their requirements for the product, i.e. the residential building. However, the handling of communication with users in building projects has been insufficiently specified and studied. Drawing on a study of user involvement in building project design, production, and manag...

متن کامل

Crisis Construction and Organizational Learning: Capability Building in Catching-up at Hyundai Motor

Effective organizational beaming requires high absorptive capacity, which has two major elements: prior knowledge base and intensity of effort. Hyundai Motor Company, the most dynamic automobile producer in developing countries, pursued a strategy of independence in developing absorptive capacity. In its process of advancing from one phase to the next through the preparation for and acquisition...

متن کامل

The Roles of Information Technology in Organizational Capability Building: An IT Capability Perspective

The objective of this study is to examine why and under what situations certain information technology resources can generate positive organizational outcomes. To achieve this, we adopt the organizational capability perspective. Based on this perspective, IT can be viewed as a functional capability that forms highlevel dynamic capability in the copresence of other functional capabilities and re...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Construction Division and Management

سال: 2022

ISSN: ['1943-7862', '0733-9364']

DOI: https://doi.org/10.1061/(asce)co.1943-7862.0002216