Factors causing cost variation for constructing wastewater projects in Egypt
نویسندگان
چکیده
منابع مشابه
Significant Factors Causing Cost Overruns in Large Construction Projects in Malaysia
Once a construction projects fails in achieving effective cost performance, it will result to cost overmn. These ovemrns are caused from several factors which are very important to uncover for improving the cost performance. In Malaysia, not many research works have been carried out on study~ng cost performance factors. Hence, this study was conducted to identify the significant factors causing...
متن کاملIdentification of Factors Causing Time and Cost Overruns in Offshore Petroleum Modification Projects
Many of the production facilities and technologies operated on the Norwegian Continental Shelf are getting older and need to be modified to maintain the production performance at the desirable level. Each modification project is unique, and therefore needs to be evaluated and verified with consideration to all specifications. However, the oil and gas industry experience shows that the execution...
متن کاملA Neural Network Model for Construction Projects Site Overhead Cost Estimating in Egypt
Estimating of the overhead costs of building construction projects is an important task in the management of these projects. The quality of construction management depends heavily on their accurate cost estimation. Construction costs prediction is a very difficult and sophisticated task especially when using manual calculation methods. This paper uses Artificial Neural Network (ANN) approach to...
متن کاملA cost recovery model for tertiary canal improvement projects, with an example from Egypt
The potential farm-level gains from improvements in a tertiary canal vary among farmers according to their location along the canal. An economic model describing that variation is developed using the concept of irrigation success, which considers the degree to which water volume and quality, and the timing of irrigation events match the requirements of plants throughout a season. A bid-rent mod...
متن کاملSuccess and failure factors for e-government projects: A case from Egypt
and hosti 013.06.00 Abstract E-government implementations in developing countries still face difficulties, leading to a large failure ratio. This is too high a cost for developing countries. Analysis of the reasons behind success and failure of e-government projects is still an interesting domain of investigation. Several approaches were advanced and success and failure factors have been stipul...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Alexandria Engineering Journal
سال: 2013
ISSN: 1110-0168
DOI: 10.1016/j.aej.2012.11.004