Farmerless Profit-Oriented Irrigation Scheduling Strategy for Solid Sets. II: Assessment
نویسندگان
چکیده
منابع مشابه
Profit-oriented task scheduling algorithm in Hadoop cluster
Nowadays, many enterprises provide cloud services based on their own Hadoop clusters. Because the resources of a Hadoop cluster are limited, the Hadoop cluster must select some specific tasks to allocate limited resources in order to get the maximal profit. In this paper, we study the maximal profit problem for a given candidate task set. We describe the candidate task set with a valid sequence...
متن کاملProfit - oriented shift scheduling of inbound contact centers with skills
This paper presents a profit-oriented shift scheduling approach for inbound contact centers. The focus is on systems in which multiple agent classes with different qualifications serve multiple customer classes with different needs. We assume that customers are impatient, abandon if they have to wait, and that they may retry. A discrete-time modeling approach is used to capture the dynamics of ...
متن کاملQuality- and profit-oriented scheduling of flexible resource-constrained projects
We study the problem of determining both the structure and the schedule of projects subject to capacity constraints. We assume that those projects are flexible in the sense that the activities to be implemented are not entirely known in advance. In such a setting, decisions must be made with respect to the implementation of the optional activities. Such decisions affect the duration, cost, qual...
متن کاملRetail store scheduling for profit
In spite of its tremendous economic significance, the problem of sales staff schedule optimization for retail stores has received relatively scant attention. Current approaches typically attempt to minimize payroll costs by closely fitting a staffing curve derived from exogenous sales forecasts, oblivious to the ability of additional staff to (sometimes) positively impact sales. In contrast, th...
متن کاملOptimal generation scheduling strategy for profit maximization of genco in deregulated power system
A GA based optimal generation scheduling strategy is developed to solve the profit maximization problem for GENCO in the day ahead market. It is a multi objective formulation that includes the forecasted demand, forecasted market clearing price, startup cost and profit functions, besides the generating limits and demand constraints. The proposed GA approach is investigated on three unit and ten...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Irrigation and Drainage Engineering
سال: 2016
ISSN: 0733-9437,1943-4774
DOI: 10.1061/(asce)ir.1943-4774.0000988