Features of using equipment for in-pit crushing and conveying technology on the open pit walls with complex structure

نویسندگان

چکیده

Purpose is to substantiate the use of an in-pit crushing and conveying technology at open pits with complex structure working zone, which technological includes inclined steeply conveyors for improved economic efficiency mineral mining deep levels. Methods. The study applies a method including: technical-economical analysis practice enterprises, experience using units concentration plants pits; mining-geometrical in terms pit sections – identify zone wall its features along depth; structural developments improve design steeply-inclined conveyor; simulation modelling processes select optimal technical solutions. Findings. Basing on performed studies, it has been identified that transfer new trend technology, considering pit, rather prospective. In this context, expedient or deep-trough sites inclination angle 10-18°; case 30-36°, recommended conveyors. Originality. For first time, relation between formation complexes identified. Dependences boundary αn pipe conveyor non-filling θ belt cargo different coefficients cargo-belt friction have defined. Practical implications. obtained results make possible widen application sphere increase technology.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Determination of the largest pit with the non-negative net profit in the open pit mines

The determination of the Ultimate Pit Limit (UPL) is the first step in the open pit mine planning process. In this stage that parts of the mineral deposit that are economic to mine are determined. There are several mathematical, heuristic and meta-heuristic algorithms to determine UPL. The optimization criterion in these algorithms is maximization of the total profit whilst satisfying...

متن کامل

Open pit limit optimization using dijkstra’s algorithm

In open-pit mine planning, the design of the most profitable ultimate pit limit is a prerequisite to developing a feasible mining sequence. Currently, the design of an ultimate pit is achieved through a computer program in most mining companies. The extraction of minerals in open mining methods needs a lot of capital investment, which may take several decades. Before the extraction, the p...

متن کامل

determination of the largest pit with the non-negative net profit in the open pit mines

the determination of the ultimate pit limit (upl) is the first step in the open pit mine planning process. in this stage that parts of the mineral deposit that are economic to mine are determined. there are several mathematical, heuristic and meta-heuristic algorithms to determine upl. the optimization criterion in these algorithms is maximization of the total profit whilst satisfying the...

متن کامل

A quantitative model for evaluation and classification of blastings in open-pit mines

By evaluation of the blasting results, a proper blast pattern can be presented. It is, therefore, essential to employ a reliable method to evaluate blastings for the effective control and optimization of the main cycle operations. This paper aims to propose a criterion for evaluating the blasting results such as the fragmentation, muckpile condition, back-break, and fly rock, and to make a poss...

متن کامل

the effects of changing roughness on the flow structure in the bends

flow in natural river bends is a complex and turbulent phenomenon which affects the scour and sedimentations and causes an irregular bed topography on the bed. for the reason, the flow hydralics and the parameters which affect the flow to be studied and understand. in this study the effect of bed and wall roughness using the software fluent discussed in a sharp 90-degree flume bend with 40.3cm ...

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mining of Mineral Deposits

سال: 2022

ISSN: ['2415-3435', '2415-3443']

DOI: https://doi.org/10.33271/mining16.04.096