Ferrybridge CCPilot100+ Operating Experience and Final Test Results
نویسندگان
چکیده
منابع مشابه
Results from the Final Focus Test Beam
First experimental results from the Final Focus Test Beam (FFTB) are given in this report. The FFTB has been constructed as a prototype for the final focus system of a future TeV-scale electron-positron linear collider. The vertical dimension of the 47 GeV electron beam from the SLAC linac has been reduced at the focal point of the FFTB by a demagnification of 320 to a beam height of approximat...
متن کاملOperational Test Results of the Passive Final Approach Spacing Tool
A prototype decision support tool for terminal area air traffic controllers, referred to as the Final Approach Spacing Tool (FAST), was recently evaluated in operation with live air traffic at the Dallas/Fort Worth, Texas Airport. Controllers utilized FAST’s runway and sequence advisories to manage and control arrival traffic during more than twenty-five peak rush traffic periods. This paper pr...
متن کاملFirst Results from the Final Focus Test Beam*
We have used the Final Focus Test Beam beamline and associated instrumentation to reduce the 46.6 GeV SLAC electron beam to a vertical size of 70 nm. This represents a reduction from the linac beam size by a factor of 320, comparable to the demagnification required by a TeV-scale linear collider, and addresses the same aberrations predicted in such an environment. The beam dimensions were measu...
متن کاملOperating Experience with Raydac
THE RA YDAC acceptance tests were run from June 4 to July 19, 1952, in five sessions of 3 days each. The tests were divided into three phases. Phase 1 consisted of programmed test routines which caused each unit of the computer to go through its various combinations of operations. This included tests of the terminal equipment, central control, and internal memory; the arithmetic unit; and the e...
متن کاملLENS Operating Experience
Indiana University is operating a Low Energy Neutron Source which provides cold neutrons for material research and neutron physics and MeV energy for the neutron radiation effects studies. Neutrons are being produced by a 13 MeV proton beam incident on a Beryllium target. The LENS Proton Delivery System (PDS) is routinely operating at 13 MeV and 25 mA at 1.8% duty factor. The RF system, consist...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Energy Procedia
سال: 2014
ISSN: 1876-6102
DOI: 10.1016/j.egypro.2014.11.655