Financing Methods for Small-Scale Hardwood Plantations in Queensland, Australia

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Harvesting Costs and Utilization of Hardwood Plantations’

The use of short rotation, intensive culture (SRIC) practices in hardwoods to meet fiber supply needs is becoming increasingly widespread. Total plated area of short rotation hardwood fiber plantations is currently about 22,OfKI ha (McDonald and Stokes 1993). That figure should certainly to grow in response to public concerns over loss of natural hardwood stands. With many of the plantations cu...

متن کامل

Entrepreneurship Financing and Nation Building in Nigeria: Evidence from Agricultural Small and Medium Scale Enterprises

An attempt has been made in this study to examine the relationship between entrepreneurship financing from the perspective of agricultural small and medium scale enterprises and nation building in Nigeria from 1990 to 2017. Data were collected from the Central Bank of Nigeria Statistical Bulletin with the application of Autoregressive Distributed Lagged and Bounds test to address the objective ...

متن کامل

THE UNIVERSITY OF QUEENSLAND Queensland 4072 Australia

This document presents a formal abstract syntax in Z for fragments in the CARE language. Constraints are included which deene the \semantic checks" which deene well-formedness of fragments.

متن کامل

Analysis of Spacing for Spotted Gum Plantations for Maximising Merchantable Logs’ Volume in South East Queensland, Australia

Spotted gum (Corymbia citriodora subspecies Variegata) has the potential to be the major hardwood species for large-scale plantations in South East Queensland, Australia, but production research is limited due to the lack of age of research plots. Optimal spacing is a major subject of concern. Based on time series data from a spotted gum experiment site, growth performance is analysed for five ...

متن کامل

THE UNIVERSITY OF QUEENSLAND Queensland 4072 Australia

We have recently extended the sequential refinement calculus to handle real-time programs. A novel deadline command allows execution time limits to be expressed in a high-level language. The calculus allows refinement steps that separate timing constraints from non-timing requirements. Rules are provided for handling timing constraints, but the refinement of components implementing non-timing r...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Small-scale Forestry

سال: 2009

ISSN: 1873-7617,1873-7854

DOI: 10.1007/s11842-009-9092-4