Five things you should know about cost overrun

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Five Things You Should Know about Soldier – Robot Teaming

The Human Research and Engineering Directorate (HRED), U.S. Army Research Laboratory (ARL) and partner Tank and Automotive Research Development Command (TARDEC) embarked on a 5-year Army Technology Objective (ATO) research program that addressed human robot interaction (HRI) and teaming for both unmanned aerial vehicles (UAV) and unmanned ground vehicles (UGV). The program’s objective was to un...

متن کامل

Five Things Everyone Should Know about SCHIP

In August 1997, Congress enacted the State Children’s Health Insurance Program (SCHIP), with bipartisan support, as Title XXI of the Social Security Act. SCHIP gives states a higher federal match than Medicaid—that is, a higher federal contribution for every dollar of state funds spent on the program. In contrast to Medicaid, however, SCHIP’s federal contribution is not an open-ended entitlemen...

متن کامل

5 things you should know about co-management arrangements.

Key factors that a hospital finance leader should focus on when considering a potential co-management agreement with physicians, in which the physicians are compensated at fair market value, include: Fee structure of the agreement. The quality metrics that will be used. Benchmarking to set appropriate targets for metrics. Historical performance against the metrics. Legal guidelines regarding su...

متن کامل

Twenty one important things you should know

In the March Microbial Biotechnology special issue on bioremediation, a new feature called ‘Crystal Ball 2009’ was published. In this section leading researchers in the field of microbial biotechnology looked into their crystal balls and speculated on the technical and conceptual developments that will drive innovative research and open new vistas over the next few years. Twenty one separate ar...

متن کامل

Ten Things Everyone Should Know About Inflation

These lecture notes are organized into ten lessons that summarize the status of inflationary cosmology. 1 Inflation is a Bold and Expansive Paradigm The hot big-bang cosmology is very successful. It provides a physical description of the Universe from about 10 sec onward [1]. However, it raises fundamental questions about initial conditions: The origin of the smoothness and flatness of our Hubb...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Transportation Research Part A: Policy and Practice

سال: 2018

ISSN: 0965-8564

DOI: 10.1016/j.tra.2018.07.013