Fleet Sizing for Offshore Supply Vessels with Stochastic Sailing and Service Times

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Fleet Sizing for Offshore Supply Vessels with Stochastic Sailing and Service Times

In this paper we address a supply vessel planning problem arising in servicing oil and gas offshore installations. Supply vessels provide offshore installations with necessary supplies on periodic basis from offshore supply bases according to weekly sailing schedules. The execution of weekly schedules during the year is affected by weather conditions influencing on sailing time and service dura...

متن کامل

Fleet sizing for offshore supply vessels

Supply vessels provide offshore installations with necessary supplies on periodic basis from an onshore base according to weekly sailing plans. Each plan is built for a certain time horizon to guarantee required level of service to offshore installations at least cost. In a sailing plan several voyages are assigned to each vessel. The execution of sailing plans is affected by stochastic weather...

متن کامل

Robust Supply Vessel Planning with Heuristics

Supply vessel planning problem arises in the upstream offshore oil and gas logistics, where supply vessels are the most expensive logistics resource. A fleet of supply vessels provides delivery of necessary materials and equipment to a set of offshore installations on a periodic basis from an onshore supply base. The problem itself involves scheduling, routing and packing decisions. The objecti...

متن کامل

A Capacitated Lot Sizing Problem with Stochastic Setup Times

In this paper, we study a Capacitated Lot Sizing Problem with Stochastic Setup Times (CLSP-SST).We describe a mathematical model that considers both regular costs (including production, setup and inventory holding costs) and expected overtime costs (related to the excess usage of capacity). The CLSP-SST is formulated as a two-stage stochastic programming problem. A procedure is proposed to effe...

متن کامل

Stochastic lot sizing problem with controllable processing times ¬リニ

In this study, we consider the stochastic capacitated lot sizing problem with controllable processing times where processing times can be reduced in return for extra compression cost. We assume that the compression cost function is a convex function as it may reflect increasing marginal costs of larger reductions and may be more appropriate when the resource life, energy consumption or carbon e...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Procedia Computer Science

سال: 2014

ISSN: 1877-0509

DOI: 10.1016/j.procs.2014.05.346