Flexible Multi-Objective Transmission Expansion Planning with Adjustable Risk Aversion

This paper presents a multi-objective transmission expansion planning (TEP) framework. Rather than using the conventional deterministic reliability criterion, a risk component based on the probabilistic reliability criterion is incorporated into the TEP objectives. This risk component can capture the stochastic nature of power systems, such as load and wind power output variations, component av...

متن کامل

A Multi-objective Transmission Expansion Planning Strategy: A Bilevel Programming Method

This paper describes a methodology for transmission expansion planning (TEP) within a deregulated electricity market. Two objective functions including investment cost (IC) and congestion cost (CC) are considered. The proposed model forms a bi-level optimization problem in which upper level problem represents an independent system operator (ISO) making its decisions on investment while in the l...

متن کامل

A Fuzzy Multi Objective Programming Model for Power Generation and Transmission Expansion Planning Problem

The increasing consumption of electricity over time forces different countries to establishnew power plants and transmission lines. There are various crisp single-objective mathematicalmodels in the literature for the long-term power generation and transmission expansion planning tohelp the decision makers to make more reasonable decisions. But, in practice, most of the parametersassociated wit...

متن کامل

A New Multi-objective Model for Multi-mode Project Planning with Risk

The purpose of this problem is to choose a set of project activities for crashing, in a way that the expected project time, cost and risk are minimized and the expected quality is maximized. In this problem, each project activity can be performed with a specific executive mode. Each executive mode is characterized with four measures, namely the expected time, cost, quality and risk. In this pap...

متن کامل

Transmission expansion planning based on merchandizing surplus of transmission lines

This paper proposes an optimal transmission expansion planning (TEP) which is based on determining share of each line in merchandizing surplus (MS) of system, determining by Independent System Operator (ISO). The more share of a line in MS of system denotes the priority of a line for expansion. The procedure of determining MS of each line in a power system is based on determining the MS share o...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Energies

سال: 2017

ISSN: 1996-1073

DOI: 10.3390/en10071036