Flood Damage Assessment for Pergau Hydroelectric Power Project using HEC-FIA

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Flood damage assessment for Dhaka City, Bangladesh

Flood damage assessment is a key component in the development of city flood risk management strategies. A flood damage assessment model is being developed by combining flood hazard information (depth, extent, velocity, duration, etc.) with geographic information (land use/cover, buildings, infrastructure, etc.), social-economic data and population demographics to estimate urban flood impacts. I...

متن کامل

“ Assessment of economic flood damage ”

Damage assessments of natural hazards supply crucial information to decision support and policy development in the fields of natural hazard management and adaptation planning to climate change. Specifically, the estimation of economic flood damage is gaining greater importance as flood risk management is becoming the dominant approach of flood control policies throughout Europe. This paper revi...

متن کامل

assessment of the park- ang damage index for performance levels of rc moment resisting frames

چکیده هدف اصلی از طراحی لرزه ای تامین ایمنی جانی در هنگام وقوع زلزله و تعمیر پذیر بودن سازه خسارت دیده، پس از وقوع زلزله است. تجربه زلزله های اخیر نشان داده است که ساختمان های طراحی شده با آیین نامه های مبتنی بر نیرو از نظر محدود نمودن خسارت وارده بر سازه دقت لازم را ندارند. این امر سبب پیدایش نسل جدید آیین نامه های مبتنی بر عملکرد شده است. در این آیین نامه ها بر اساس تغییرشکل های غیرارتجاعی ...

15 صفحه اول

Power plant project risk assessment using a fuzzy-ANP and fuzzy-TOPSIS method

Economic growth in developing countries has resulted in increasing demand for infrastructure projects like power plants. To meet these development needs, the government of Iran has engaged companies to carry out power plant projects. While many papers have been written on the subject of project risk management, little information exists on the actual use of risk management in practice. The prim...

متن کامل

MICRO-HYDROELECTRIC PROJECT PHASE III Design Team

Phase III development of a micro-hydroelectric power generating system is focused on enhancing the system designed by Phases I and II. The previous phases focused on the use of the Gorlov Helical Turbine (GHT) to derive power from a fresh water environment, specifically the Stevens River in Vermont. Phase III exclusively focused on deriving power from an ocean environment and the construction o...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IOP Conference Series: Earth and Environmental Science

سال: 2021

ISSN: 1755-1307,1755-1315

DOI: 10.1088/1755-1315/704/1/012002