Flowshop scheduling with machine deterioration based on job sequences

نویسندگان

چکیده

This paper addresses the two-machine permutation flowshop problem with deterioration. The objectives are minimizing makespan and average tardiness. Jobs have a baseline process time in each machine due date. actual to job depends on performance level at start of job, which is function previously processed jobs their wear/deterioration effect machine. article proposes multiple heuristics comprehensive set experiments. results indicate that as group, generate solutions very close optimal for both criteria. Furthermore, no heuristic approach dominant all experimental conditions, thus selection solve practical problems should be based specific characteristics.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Single Machine Scheduling with Job-Dependent Machine Deterioration

We consider the single machine scheduling problem with job-dependent machine deterioration. In the problem, we are given a single machine with an initial non-negative maintenance level, and a set of jobs each with a non-preemptive processing time and a machine deterioration. Such a machine deterioration quantifies the decrement in the machine maintenance level after processing the job. To avoid...

متن کامل

Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration

This paper considers two scheduling problems for a two-machine flowshop where a single machine is followed by a batching machine. The first problem is that there is a transporter to carry the jobs between machines. The second problem is that there are deteriorating jobs to be processed on the single machine. For the first problem with minimizing the makespan, we formulate it as a mixed integer ...

متن کامل

Scheduling flexible maintenance activities subject to job-dependent machine deterioration

This paper focuses on single machine scheduling subject to machine deterioration. The current maintenance state of the machine is determined by a maintenance level. While jobs are processed this maintenance level drops by a certain, possibly job-dependent, amount. A maintenance level of less than zero is associated with the machine’s breakdown and is therefore forbidden. Consequently, schedule ...

متن کامل

Two-Machine Flowshop Scheduling with Conditional

This paper considers a flowshop scheduling problem with a waiting time constraint imposed to restrict the processing of the two operations of each job. If the second operation of a job cannot start within a specified waiting time after the completion of its first operation, then an extra processing time will be incurred for its second operation as a penalty. We first show that is even a greatly...

متن کامل

Bicriteria Scheduling on a Single Batching Machine with Job Transportation and Deterioration Considerations

We study a single batching machine scheduling problem with transportation and deterioration considerations arising from steel production. A set of jobs are transported, one at a time, by a vehicle from a holding area to the single batching machine. The machine can process several jobs simultaneously as a batch. The processing time of a job will increase if the duration from the time leaving the...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Ingeniería y Competitividad

سال: 2021

ISSN: ['0123-3033', '2027-8284']

DOI: https://doi.org/10.25100/iyc.v23i2.10099