FMEA AND PMBOK APPLIED TO PROJECT RISK MANAGEMENT

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Using fuzzy FMEA and fuzzy logic in project risk management

Risk management is one of the most important phases of project management and isthe most recently used by many researchers. In this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.Then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy FMEA a...

متن کامل

Project Risk Management Using the Project Risk FMEA

numerous types of development projects, Adams reported similar numbers, where only about one-fourth of all projects entering development become a market success (2004). Datta and Mukerjee (2001) stated that “successful project completion depends to a great extent on the early identifi cation of immediate risks.” Jiang et al. (2002), using factor analysis, confi rmed their hypothesis that risks ...

متن کامل

using fuzzy fmea and fuzzy logic in project risk management

risk management is one of the most important phases of project management and isthe most recently used by many researchers. in this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy fmea a...

متن کامل

Comparing PMBOK and Agile Project Management software development processes

The objective of this article is to compare a generic set of project management processes as defined in Project Management Body of Knowledge (PMBOK) with a number of agile project management processes. PMBOK is developed by Project Management Institute and it is structured around five process groups (initiating, planning, execution, controlling and closure) and nine knowledge areas (integration...

متن کامل

Project Managers Competencies based on ICB and Project Management Processes based on PMBOK in Project Based Organization (Case study: Hydropower Plants Management)

Effective implementation of managerial systems needs software and hardware requirements. Project management competencies of the managers is one of the most important and inevitable requirements to ensure the success of the projects in any industry. Inorder to clarify the requirements, many international and professional instituts have presented well-known frameworks to help the managers to shap...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: JISTEM Journal of Information Systems and Technology Management

سال: 2008

ISSN: 1807-1775

DOI: 10.4301/s1807-17752008000200008