Forensic Delay Analysis as Evidence of Transaction Costs in Construction Projects

نویسندگان

چکیده

Abstract Construction projects are characterised by supply chains with multiple contracts and significant transaction costs. An example of these costs is to be found in the management project delays. The operationalisation measurement costs, especially construction context, has hitherto proved difficult. work reported here concerned defining measuring resources required for contractual disputes relating Its main argument that concepts from cost economics (TCE) theory (bounded rationality, uncertainty, information asymmetry, opportunistic behaviour) present serious problems efficiency. This exemplified forensic analysis Data twelve case studies analysed, reveal up 90% time spent on delay was searching validating which could, ostensibly, automatically reliably captured using digital technologies. research forms part a wider study considers implications identified inefficiencies makes exploitation advances technology more efficient resolution (or even avoidance) disputes. It concludes there prima facie this, therefore reduction relate

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Legal Analysis of bank in the Iranian commercial market based on the theory of transaction costs

Understanding the necessity of establishing a bank in Iran requires a correct realizing of the mechanism of the money market in an era in which banks had no place or position. At that time distrusting on the borrower credits, lack of reliable information about the number and place of lenders, rising interest rates and the prevalence of high- interest borrowing were some of the costs that transa...

متن کامل

Analyzing delay causes in Egyptian construction projects

Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction delay causes retrieved from literature. The feedback of construction experts was obtained through i...

متن کامل

Analysis on Components Complexity During Execution of Construction Projects

Development is the fundamental area in enabling India`s economy and urban and provincial structure. Development is a multi-connected structure where all variables are bury connected and multi-centered. All the three limitations time, expense and quality ought to be adjusted in an improved way, so that no segment gets influenced by dismissing those. The goal of this study is to distinguish the m...

متن کامل

Application of Evidence Theory to Construction Projects

Crucial decisions are necessary throughout the life-cycle of large-scale construction projects. Such decisions are critical in that they have a direct impact upon the outcomes and success of a given project. To improve the decision process, an evidential reasoning framework based on the Dezert-Smarandache theory of plausible and paradoxical reasoning, where heterogeneous evidence sources are fu...

متن کامل

analysis of power in the network society

اندیشمندان و صاحب نظران علوم اجتماعی بر این باورند که مرحله تازه ای در تاریخ جوامع بشری اغاز شده است. ویژگیهای این جامعه نو را می توان پدیده هایی از جمله اقتصاد اطلاعاتی جهانی ، هندسه متغیر شبکه ای، فرهنگ مجاز واقعی ، توسعه حیرت انگیز فناوری های دیجیتال، خدمات پیوسته و نیز فشردگی زمان و مکان برشمرد. از سوی دیگر قدرت به عنوان موضوع اصلی علم سیاست جایگاه مهمی در روابط انسانی دارد، قدرت و بازتولید...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IOP conference series

سال: 2022

ISSN: ['1757-899X', '1757-8981']

DOI: https://doi.org/10.1088/1755-1315/1101/5/052009