Forward-Looking State-of-the-Art Review on Earned Value Management Systems: The Disconnect between Academia and Industry

نویسندگان

چکیده

Earned value management (EVM) is a project approach that can enhance the probability of success. It applied widely across different industry sectors (e.g., energy, aerospace, construction, defense, and manufacturing), generally through use an earned system (EVMS). A holistic up-to-date literature review on EVM EVMS does not exist. provide comprehensive perspective topic, identifying summarizing existing body knowledge, as foundation to advance state practice EVM/EVMS. Therefore, objective this paper investigate EVM/EVMS art by critically reviewing academic publications, with specific focus maturity environment surrounding its implementation. By performing systematic review, authors identified 600 publications since inception concept in 1962, then narrowed down list 160 relevant from last decade for closer review. The findings include discovery eight emergent themes. Of these themes, “forecasting/prediction” constitutes largest portion recent literature, followed “application EVMS.” One interesting finding maturity, although being critical only discussed one publication. Publications focused have increased significant differences were found between academia terms limitations extensions EVM/EVMS, environment, compliance. key designing reliable should combine both technical social aspects This forward-looking provides state-of-the-art while highlighting gaps knowledge introducing new perspectives support research application.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

on translation of phatic communion and socio-cultural relationships between the characters of the novels

phatic communion is a cultural concept which differs across cultures. according to hofstede (2001), the u.s. tends to have individualistic culture; however, asian countries tend to have collectivistic cultures. these cultures view phatic communion differently. in individualistic cultures like u.s., phatic communion reflects speakers’ socio-cultural relationships in conversations. to see whether...

15 صفحه اول

on the relationship between the knowledge of collocations and writing proficiency

بررسی رابطه دانش همنشینی لغات و مهارت نوشتاری در زبان انگلیسی چکیده این پژوهش درصدد آن است تا سه مسئله زیر را مورد بررسی قرار دهد: الف) وجود یا عدم وجود رابطه بین دانش زبان آموزان در حوزه همنشینی لغات با یکدیگر و دانش آنها در مهارت نوشتاری زبان انگلیسی؛ ب) یافتن پاسخی به این سوال که آیا تمامی انواع همنشینی های لغوی زبان انگلیسی به یک میزان برای زبان آموزان دشوارند یا خیر؛ پ) مقایسه زبان آمو...

15 صفحه اول

on the relationship between using discourse markers and the quality of expository and argumentative academic writing of iranian english majors

the aim of the present study was to investigate the frequency and the type of discourse markers used in the argumentative and expository writings of iranian efl learners and the differences between these text features in the two essay genres. the study also aimed at examining the influence of the use of discourse markers on the participants’ writing quality. to this end the discourse markers us...

15 صفحه اول

the impact of peer review on efl reviewers writing proficiency

امروزه تصحیح همکلاسی در کلاسهای نگارش یکی از اجزاء لاینفک کلاسهای دانش آموز محور است. تاثیرات مفید تصحیح همکلاسی بر زبان آموزان، معلمان را متقاعد کرده است که علیرغم صرف زمان، انرژی و توان بسیار، از این شیوه ی آموزشی در کلاسهای آموزش نگارش بهره بگیرند. تحقیق حاضر بر آن است تا با مقایسه دو گروه از یادگیرندگان زبان انگلیسی، تاثیر تصحیح همکلاسی را بر توانایی نوشتاری آنها نشان دهد. 122 خانم زبان آمو...

15 صفحه اول

“investigating the relationship between knowledge management and customer satisfaction considering to the e-services”

چکیده : این مطالعه تاثیر مدیریت دانش بر رضایتمندی مشتریان با توجه به خدمات الکترونیک در سازمان حمل و نقل و پایانه های استان سیستان و بلوچستان را مورد بررسی قرار می دهد. جامعه آماری این تحقیق مدیران، سرپرستان و کارشناسان مشغول به کار در سازمان حمل و نقل و پایانه های استان سیستان و بلوچستان بوده که مجموعا 94 نفر می باشند. برای تعیین حداقل نمونه از جدول مورگان استفاده شده است. که با توجه به جدول ...

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Management in Engineering

سال: 2022

ISSN: ['1943-5479', '0742-597X']

DOI: https://doi.org/10.1061/(asce)me.1943-5479.0001019