Fundamental behaviour of virtual-build-to-order systems

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Fundamental behaviour of Virtual - Build - to - Order systems Philip

Virtual-Build-to-Order (VBTO) is an emerging order fulfilment system within the automotive sector that is intended to improve fulfilment performance by taking advantage of integrated information systems. The primary innovation in VBTO systems is the ability to make available all unsold products that are in the production pipeline to all customers. In a conventional system the pipeline is inacce...

متن کامل

Virtual-Build-to-Order as a Mass Customization Order Fulfilment Model

Virtual-build-to-order (VBTO) is a form of order fulfilment system in which the producer has the ability to search across the entire pipeline of finished stock, products in production and those in the production plan, in order to find the best product for a customer. It is a system design that is attractive to Mass Customizers, such as those in the automotive sector, whose manufacturing lead ti...

متن کامل

Animal Behaviour: Old World Monkeys Build New World Order

New experimental evidence shows that policing behaviour by dominant monkeys stabilizes and integrates macaque societies.

متن کامل

Virtual-Build-to-Order as an order fulfilment model for Mass Customization

Virtual-build-to-order (VBTO) is a form of order fulfilment process in which the producer has the ability to search across the entire pipeline of finished stock, products in production and those in the production plan in order to find the best match for a customer. This paper describes VBTO and identifies the range of operational and performance factors that arise in such systems. Customer sati...

متن کامل

Comparative analysis of design/build and design/bid/build project delivery systems in Lebanon

Design/bid/build and design/build are two principal project delivery systems used worldwide. The performance of each project may differ with the type of procurement system used. This study has two aims: firstly, to assess and compare the performance of design/bid/build and design/build projects in Lebanon; secondly, to compare the results with the performance of equivalent systems in the Far Ea...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Production Economics

سال: 2006

ISSN: 0925-5273

DOI: 10.1016/j.ijpe.2006.02.007