Fuzzy Critical Path Problem for Project Network
The task of finding the crisp critical path has received researcher’s attention over the past two decades which has wide range of applications in planning and scheduling the large projects. In most cases of our life, the data obtained for decision makers are only approximate, which gives rise to fuzzy critical path problem. In this paper, new ranking methods are introduced to identify the fuzzy...
متن کاملSecondary Critical Path in a Fuzzy Project Network
In a fuzzy project network, the higher risk path is called possible critical path. Secondary critical path is one of the possible critical path in fuzzy project network and it plays an important role in the project scheduling, risk analysis and time-cost trade-off problems in fuzzy environment. In this paper, triangular fuzzy numbers are used to express the operation times for all activities in...
متن کاملSolving Critical Path Problem in Project Network by a New Enhanced Multi-objective Optimization of Simple Ratio Analysis Approach with Interval Type-2 Fuzzy Sets
Decision making is an important issue in business and project management that assists finding the optimal alternative from a number of feasible alternatives. Decision making requires adequate consideration of uncertainty in projects. In this paper, in order to address uncertainty of project environments, interval type-2 fuzzy sets (IT2FSs) are used. In other words, the rating of each alternativ...
متن کاملShortest Path Problem on Intuitionistic Fuzzy Network
Received 17September 2013; accepted 5 October2013 L Baba Abstract. Finding shortest paths in graphs has been the area of interest for many researchers. Shortest paths are one of the fundamental and most widely used concepts in networks. In this paper the authors present an algorithm to find an Intuitionistic Fuzzy Shortest Path (IFSP) in a directed graph in which the cost of every edges are rep...
متن کاملA New Approach to find Total Float time and Critical Path in a fuzzy Project Network
The purpose of the critical path method (CPM) is to identify the critical activities in the critical path of an activity network. In the real world for many projects we have to use human judgment for estimating the duration of activities. However, the unknowns or vagueness about the time duration for activities in network planning, has led to the development of fuzzy CPM. A way to deal with thi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Pure and Apllied Mathematics
سال: 2013
ISSN: 1311-8080,1314-3395
DOI: 10.12732/ijpam.v85i2.4