Fuzzy Logic and Fuzzy Hybrid Techniques for Construction Engineering and Management

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Using fuzzy FMEA and fuzzy logic in project risk management

Risk management is one of the most important phases of project management and isthe most recently used by many researchers. In this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.Then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy FMEA a...

متن کامل

Fuzzy Knowledge Management through Knowledge Engineering and Fuzzy Logic

Knowledge management (KM) facilitates the capture, storage, and dissemination of knowledge using information technology. In this paper, we propose a FKM (Fuzzy Knowledge Management) approach to managing fuzzy knowledge through knowledge engineering and fuzzy logic. First, fuzziness is introduced into CGs (Conceptual Graphs) for constructing fuzzy knowledge models. Fuzzy knowledge models are use...

متن کامل

an application of fuzzy logic for car insurance underwriting

در ایران بیمه خودرو سهم بزرگی در صنعت بیمه دارد. تعیین حق بیمه مناسب و عادلانه نیازمند طبقه بندی خریداران بیمه نامه براساس خطرات احتمالی آنها است. عوامل ریسکی فراوانی می تواند بر این قیمت گذاری تاثیر بگذارد. طبقه بندی و تعیین میزان تاثیر گذاری هر عامل ریسکی بر قیمت گذاری بیمه خودرو پیچیدگی خاصی دارد. در این پایان نامه سعی در ارائه راهی جدید برای طبقه بندی عوامل ریسکی با استفاده از اصول و روش ها...

using fuzzy fmea and fuzzy logic in project risk management

risk management is one of the most important phases of project management and isthe most recently used by many researchers. in this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy fmea a...

متن کامل

Using Hybrid Fuzzy PROMETHEE II and Fuzzy Binary Goal Programming for Risk Ranking: A Case Study of Highway Construction Projects

Multi attribute decision making methods are considered as one of the most useful methods for solving ranking problems. In some decision making problems, while the alternatives for corresponding criteria are compared in a pairwise comparison manner, if the criteria are inherently fuzzy, debates will arise in ranking alternatives due to the closeness of the values of the criteria. In this researc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Construction Engineering and Management

سال: 2020

ISSN: 0733-9364,1943-7862

DOI: 10.1061/(asce)co.1943-7862.0001854