Gas-dynamic method for taking off aircraft's

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Taking off

The world's largest parrot has proved a conservation challenge.

متن کامل

Analytical Dynamic Modelling of Heel-off and Toe-off Motions for a 2D Humanoid Robot

The main objective of this article is to optimize the walking pattern of a 2D humanoid robot with heel-off and toe-off motions in order to minimize the energy consumption and maximize the stability margin. To this end, at first, a gait planning method is introduced based on the ankle and hip joint position trajectories. Then, using these trajectories and the inverse kinematics, the position tra...

متن کامل

Taking the brakes off?

In this issue of Blood, MacQarrie and colleagues show that histidine-rich glycoprotein (a negative acute-phase reactant), inhibits activated factor XII, a clotting protein implicated in inflammation and thrombosis.1 O f the 2 mechanisms for triggering blood clotting, only the tissue factor pathway is essential for normal hemostasis. The other— the contact pathway—appears to have no hemostatic r...

متن کامل

A New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value

Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...

متن کامل

A New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value

Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Electronics and Control Systems

سال: 2011

ISSN: 1990-5548

DOI: 10.18372/1990-5548.27.269